Laserfiche WebLink
2.6 Blockage of Road by Flooding due to Flows from Reclamation Ditches <br /> Figure 14 is extracted from Figure G-12 of the Transit Mix application. It shows the Water <br /> Management Plan for the Final Reclamation Phase. In this plan,there are several ditches which <br /> will be built to drain the reclaimed North Pit, South Pit and Fines storage area into Little Turkey <br /> Creek. These ditches are the blue lines drawn on the image. Depending on the exact location of <br /> these ditches, water flowing from these ditches may run across Little Turkey Creek Road, <br /> blocking the road. The possible locations where these ditches may impact the road are circled in <br /> red. <br /> DD-F2-1 <br /> F 2 <br /> OD-F2-2 <br /> C�L�-NPR} <br /> UC.J�f:i-t <br /> F3 D.V.-GG2 <br /> drj e��1O< <br /> I <br /> �rn <br /> Figure 14 Reclamation Ditches near Little Turkey Creek Road <br />