My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_HYDROLOGY - M1999005
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999005
>
2016-04-15_HYDROLOGY - M1999005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2020 11:19:18 PM
Creation date
4/19/2016 6:04:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
Hydrology
Doc Date
4/15/2016
Doc Name
Requested Information for Monitoring Well
From
Daub & Associates, Inc.
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revision Number Log _ <br /> Revision Date By Page(s) Approval Remarks <br /> 0 12/16/15 Garrett Mitchell All N/A Draft <br /> 1 3/25/16 Garrett Mitchell All N/A Draft <br /> 2 4/1/16 R. G. Dean All N/A Draft Review <br /> 3 4/1/16 G.J. Daub All N/A Edit/Update/Revise <br /> Appendix A: Well Design: <br /> See Well Bore Diagram in Appendix E. <br /> Rig Equipment <br /> • Rotary Drill Rig <br /> Completion Equipment <br /> • -90' of 7.625" OD x 6.96" ID 26.4#J-55 conductor casing and centralizers. (min. of 40 <br /> feet into bedrock) <br /> • -1734' 4.5" OD x 4.0" ID 11.6# J-55 LT&C (Intermediate Casing) and centralizers. <br /> • --1800' feet of drill pipe. <br /> • 9.750" rotary bit and BHA <br /> • 6.5" (tri-cone) rotary bit and subs. <br /> • 4.0" rotary bit and subs <br /> Surface Equipment <br /> • Mixer for cement <br /> • Light Plants <br /> • 400 bbl water tank <br /> • Trash Bin (NS) <br /> • Porta-Potty <br /> • Mud tank <br /> • Adequate mud pump <br /> • Fuel Storage <br /> Directional Plan <br /> There is not a Directional Plan for this well. A Deviation log will be run during open hole logging to <br /> determine final well bore trajectory. <br /> Pre Drilling Operations Notes: <br /> 1. Perform a rig and location inspection before starting operations. <br /> 2. All water used for drilling and coring operations should be from an approved NS water source. <br /> Daub & Associates, Inc. Page 8 of 12 Printed: 4/5/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.