Laserfiche WebLink
April 6,2016 C-1981-041/Roadside Portals BFB <br /> conductivity was re-tested and determined to be good. Then,the electrical resistivity tomography test was <br /> conducted. The test took approximately two hours. <br /> Over the next two days, 6 more transects will be tested using the same techniques as the baseline test. The test <br /> transects will be parallel to and east of the baseline transect on 50 feet intervals with the first transect through the <br /> centerline of the Carey Pond. The final investigation report will be submitted to the Division by April 29, 2016. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> PHOTOGRAPHS <br /> axe•� �� ��=. <br /> Y <br /> ' e v <br /> a a+ <br /> 1 <br /> Photo 1 — Steel Stakes Along Transect Photo 2- Switch Box <br /> 0, <br /> t � <br /> C1 B B B WTP <br /> s, <br /> Photo 3 —Resistivity Meter Photo 4—Water Added to Base of Stake <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 3 <br />