My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-14_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2016-04-14_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:48 PM
Creation date
4/18/2016 8:35:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
4/14/2016
Doc Name
Review (Interoffice Memo)
From
Zach Trujillo
To
Robin Reilley
Type & Sequence
TR20
Email Name
ZTT
JRS
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Slope Stability Analysis <br />A slope stability analysis of the proposed West Waste Bank was performed using GALENA — <br />Slope Stability Analysis System (Galena). Material properties and parameters used in the stability <br />analysis were taken from laboratory results from on-site samples as reported in Trauatner's Report. <br />The profile was mapped in Galena using the proposed Map King I -016A profile "A". For a <br />conservative approach, groundwater was included in the analysis at a level which is highly unlikely. <br />As noted in the Report, "Based on information obtained from our test boring advanced for this <br />project as well as several previous studies near the NKC 1 portal we do not feel that shallow <br />subsurface water exists at the proposed West Bank mine waste deposit site." Results of the Galena <br />stability analysis was a factor of safety of 1.83 (attached) which exceeds the minimum requirements <br />of Rule 4.09.2(2). Factor of safety results from Trautner's Report ranged from 1.87 — 2.60. 1 have no <br />comments regarding the geotechnical design of the proposed West Waste Bank. <br />This concludes my review of King Coal Mine's TR -20. If you have questions or need additional <br />information, please contact me. <br />Sincerely, <br />Zach T. Trujillo <br />Environmental Protection Specialist <br />C -MR -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.