My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_HYDROLOGY - C1996083 (6)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2016-04-15_HYDROLOGY - C1996083 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 9:48:38 AM
Creation date
4/18/2016 7:21:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
4/15/2016
Doc Name
Pond Inspection Report
From
J. E. Stover & Associates, Inc.
To
DRMS
Annual Report Year
2016
Report Quarter_Month
1
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWIE RESOURCES, LLC <br />BOWIE NO. 2 MINE <br />2016 IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundments located at the Bowie No. 2 Mine. <br />On March 21, 2016, 1 performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the ponds have a <br />potential for failure. There was no appearance of erosion, instability, structural <br />weakness or other hazardous conditions. There are no required monitoring procedures <br />or instrumentation other than monthly and yearly inspections. There are no aspects <br />which might affect stability. None of the ponds were discharging during the inspection. <br />Pond B had a pool of water about 4 -feet below the emergency spillway at approximate <br />elevation of 5948. Sediment was removed during the previous quarter. Pond B needs <br />dewatered. <br />The water level of Pond C was at the level of the pond bottom at approximate elevation <br />5990. Pond C has 100% of its sediment capacity remaining. <br />Pond D had a pool of water standing about 2 -feet above the pond bottom at <br />approximate elevation of 5972. Estimate 10% sediment buildup. <br />Pond F had a pool of water standing about 5 -feet below the elevation of the emergency <br />spillway at approximate elevation 5949. Sediment build up could not be determined <br />because of the pool of water. <br />Pond J had a pool of water at approximate elevation of 5850. Sediment build up could <br />not be determined because of the pool of water. Estimate sediment build up is 40%. <br />Pond K had was damp with an estimated sediment build up of 20%. <br />There are no mud pits open. <br />
The URL can be used to link to this page
Your browser does not support the video tag.