My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_HYDROLOGY - C1996083 (6)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2016-04-15_HYDROLOGY - C1996083 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 9:48:38 AM
Creation date
4/18/2016 7:21:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
4/15/2016
Doc Name
Pond Inspection Report
From
J. E. Stover & Associates, Inc.
To
DRMS
Annual Report Year
2016
Report Quarter_Month
1
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` 970-249-6828 ■ 800-865-9847 (fax) ■ 222 South Park ■ Montrose, CO 81401 ■ www.dowl.com <br />Alaska ■ Arizona ■ Colorado ■ Montana ■ North Dakota ■ Oregon ■ Washington ■ Wyoming <br />COWL <br />April 4, 2016 <br />Huddleston -Berry Engineering and Testing, LLC <br />640 White Avenue <br />Grand Junction, CO 81501 <br />Attention: Mike Berry, PE <br />SUBJECT: Summary Report, First Quarter 2016, Vibrating Wire Piezometers <br />through March 2016, Bowie Mine No. 2, Coal Waste Disposal Area No. 3 <br />Dear Mr. Berry, <br />DOWL conducted quarterly monitoring of installed vibrating wire piezometers at Coal Waste <br />Disposal Area No. 3 (CWDA No. 3), Bowie Resources, LLC. This report is intended to cover the <br />time period of January through March 2016. VWP data was obtained on 3-21-16. A graphic plot <br />of measured pore pressures over time is presented on the attached Figure 1, and numerically in <br />Table 1 below. Table 1 summarizes the initial, prior and current readings and the difference in <br />individual pore pressures since installation and prior readings. <br />Table 1. Summary of Pore Pressure Readings <br />VWP ID # <br />Initial Pore <br />Pressure <br />10/31/14 <br />(psi)(psi) <br />12/19/15 <br />Pore Pressure <br />(psi) <br />3/21/16 Pore <br />Pressure <br />(psi) <br />Difference <br />Since <br />Installation <br />Difference <br />Since Last <br />Reading <br />(psi) <br />VWP-A Deep <br />10.4 <br />7.0 <br />4.4 <br />-6.0 <br />-2.6 <br />VWP-A Shallow <br />4.7 <br />4.6 <br />4.5 <br />-0.2 <br />-0.1 <br />VWP-13 Deep <br />1 0.2 1 <br />0.1 <br />1 -0.1 1 <br />-0.3 <br />-0.2 <br />VWP-13 Shallow <br />13.9 <br />14.7 <br />13.7 <br />-0.2 <br />-1.0 <br />VWP-D <br />7.1 <br />7.0 <br />6.3 <br />-0.8 <br />-0.7 <br />If you have any questions regarding this letter or the instrumentation monitoring at CWDA <br />No. 3, please don't hesitate to contact me at (970) 497-8827 or o62g dorf@dow/.com. <br />Respectfully Submitted, <br />DOWL <br />Wayne Pandorf, P.E. <br />Sr. Geotechnical Engineer <br />Enclosure: Figure 1 — Vibrating Wire Piezometer Data Graph <br />Bowie CDWA 3 Q1 2016 VWP Report 4-4-16 <br />Project #7131.74526.01 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.