My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-21_PERMIT FILE - C1981041 (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041
>
2016-01-21_PERMIT FILE - C1981041 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:49 PM
Creation date
4/15/2016 2:11:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
1/21/2016
Section_Exhibit Name
Tab 14 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Six inches of topsoil was salvaged from undisturbed portions of the RSRDA <br />borrow area. It is estimated about one-half of the borrow area has been <br />previously disturbed by light use roads, the upper diversion ditch and a prior <br />borrow project, therefore it will be assumed that an average of three inches of <br />topsoil was recovered from the entire area. The topsoil was stockpiled in a small <br />area below the borrow area. Reclamation of the borrow area involved grading the <br />borrow area to blend into the surrounding contours and redistribution of the <br />topsoil. The south diversion ditch was graded to approximate original contours. <br />A local agricultural business, Providence Place, Inc., purchased the Roadside <br />South Portal upon approval of a land use change application, PR -3, by the <br />Division of Reclamation, Mining and Safety. The approved land use allows for <br />the retention of the shop and warehouse on the upper level, which will be utilized <br />for equipment and supply storage and as their maintenance area. The cafeteria, <br />lab buildings, guard shack and septic tank system will be used as a seasonal fruit <br />stand and packing/cooling shed. The top of the Roadside South Refuse Disposal <br />Area and the open ground on the lower level was left open to allow for additional <br />equipment and supply storage, parking and access. The property had been <br />leased to Providence Place, Inc., since 2005 and the use of the buildings and <br />land as described above has been ongoing since that time. <br />Grading of the portal area after sealing the portals began with installation of the <br />french drain shown on Exhibit 6C. The french drain system has three branches. <br />Two of the branches intercept minor seepage from the portal seals. The third <br />branch is designed to intercept water from the hillside southwest of the conveyor <br />entry. This third leg extends above the level of the portal entries to intercept <br />seepage along the existing hillside. This seepage originates from an irrigation <br />pond located above and to the southwest of the portal. The next reclamation <br />step involved grading concrete and cinderblock remaining from demolition of the <br />shop -office complex into the portals and highwall. Sufficient amounts of dirt were <br />mixed with this material to eliminate voids and promote stability of the fill. Dirt for <br />backfill of the portal highwall was from excess material at the unit train loadout. <br />Topsoil was not salvaged from this area, therefore the best available material <br />from the cut areas were used for the final cover. An estimated 3 - 4 soil samples <br />taken while moving dirt in this area should identify the best available material. <br />A highwall is the face of exposed overburden and coal for entry into an <br />underground mine. The south portal had two potential highwalls. One was an <br />old ventilation entry along the old portal access road and the other was the intake <br />and beltline entries which were located on the portal bench. The highwalls were <br />eliminated by backfilling the area where the coal seam was exposed. Other near <br />vertical rock faces were excavated to provide room for the warehouse shop and <br />offices. These near vertical rock faces are not considered highwalls so they will <br />not be eliminated. <br />TR -68 14-7 (Rev. 12/15) <br />
The URL can be used to link to this page
Your browser does not support the video tag.