My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-14_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-04-14_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:48 PM
Creation date
4/15/2016 9:52:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/14/2016
Doc Name
Adequacy Response Review Memo
From
Jason Musick
To
Brock Bowles
Type & Sequence
TR70
Email Name
JDM
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />4/14/2016 <br />on the contour of the land it may be the case that ditches C-10 and D1W may not be required; <br />however, a discussion as to the prevention of disturbed area run-off from the west side of the <br />permit to Pond 013 was not included. Please provided a revised Map 2.05.3(3)-1 to include these <br />ditches or provide a revised Attachment 2.05.3(3)-1 providing a justification and noting that <br />these ditches are no longer required. <br />Tri-State March 21, 2016 Response: Attachment 2.05.3(3)-1 has been revised to include all <br />proposed ditches and culverts throughout the mine site and to reference other portions of the <br />PAP which include designs for ditches and culverts. <br />Division Response: Based on the March 21, 2016 submittal, the IP Tailwater Ditch 1 and the IP <br />Tailwater Ditch 2 are included with the Pond 009 design. According to Map 2.05.3(3)-1, these <br />two ditches flow to the proposed Pond 016. According to the submitted Table 2.05.3(3)-1 and <br />Attachment 2.05.3(3)-30 the design for Pond 009 includes the designs for the Taitwater ditches. <br />Additionally, Attachment 2.05.3(3)-29 includes the tailwater ditch as a part of the Pond 016 <br />design. If it is the case that the Tailwater ditches are a function of the Pond 009 watershed <br />and not the Pond 016 watershed, please update the Map 2.05.3(3)-1 and Attachment <br />2.05.3(3)-29 to identify the tailwater ditches draining to the Pond 009 watershed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.