Laserfiche WebLink
PERMIT #: M-2000-082 <br />INSPECTOR'S INITIALS: PSH <br />INSPECTION DATE: March 11, 2016 <br />As cited as a problem, the Operator must implement the approved groundwater mitigation plan for the site. <br />The Operator must submit a report to the Division within thirty (30) days. The report must include the specific <br />mitigation measures taken by the Operator to alleviate the effect of the dewatering at the E 8th Street <br />Operation on the Tyrrell well. <br />The Loloff Mine, M-1985-112, operated by Loloff Construction, Inc. was also inspected and a problem was <br />cited for groundwater impacts to the Tyrrell well associated with this complaint. The cumulative effect of <br />dewatering at both sites has caused disturbances to the prevailing hydrologic balance. The Division <br />recommends the Operator coordinate with Loloff Construction, Inc. to provide mitigation measures. <br />Photographs taken during the inspection and the inspection map are attached. <br />Page 5 of 10 <br />