My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-06_REPORT - M1978225L
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1978225
>
2016-04-06_REPORT - M1978225L
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:35 PM
Creation date
4/12/2016 9:44:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978225L
IBM Index Class Name
REPORT
Doc Date
4/6/2016
Doc Name
Annual Fee, Report & Map
From
McVey Pit
To
DRMS
Annual Report Year
2016
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pa 4 of 5 <br />Total acres <br />backfilled: <br />Total acres <br />seeded w/ <br />approved mix: <br />Total acres <br />w/topsoil <br />replaced: <br />Total acres <br />mulched w/ <br />approved mulch: <br />Total acres <br />graded: <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />Topsoil <br />replacement <br />depth (in.): <br />Mulch application <br />rate (tons): <br />Seed <br />application <br />method: <br />Fertilizer <br />application <br />method: <br />Mulch <br />application <br />method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? <br />If "YES", indicate the weed species, control area, control type, application rate and treatmen <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />NO N/A <br />on the report map. <br />NO N/A <br />NO N/A <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br />19. Is your basis for legal right to enter still valid? NO <br />20. Does your permit require you to submit monitoring information annually? YES NO N/A <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.