Laserfiche WebLink
VOLUME III <br />LIST OF FIGURES - CONTINUED <br />• <br />MR08-228 xv 03/06/08 <br />6t <br />Cross -Section Confluence of Middle and Foidel Creeks <br />7 <br />Typical Mine Section <br />7a <br />1994 Development Drillhole Location <br />7b <br />Preparation Plant Material Temporary Stockpile Location <br />8 <br />Leachate Concentration, Energy Mine No. 1 <br />9 <br />Predicted Leachate Concentration, Energy Mine No. 1 <br />10 <br />Leachate Chemistry, Energy Mine No. 1 <br />11 <br />Predictive Analysis - TDS Concentrations after 50 Years <br />l la <br />Existing Railroad Cross -Sections <br />l lb <br />Railroad Track Extension, Cross -Section, Typical Cut <br />l lc <br />Preparation Plant Topsoil and Plant Growth Media Stockpile Location <br />l ld <br />Wadge Overburden Potentiometric Surface & TDS Concentrations <br />12 <br />Design of Typical Contour Furrow <br />12a <br />Well 006-BRDH-7, Period of Record Water Level Data <br />•13 <br />Predictive Analysis after Five Years of Mining <br />13a <br />Pond E Aerator <br />14 <br />Typical Subsidence Monument <br />15 <br />Typical Portal Seals <br />16 <br />Rock Dust Bin Operations Design <br />16a <br />Southwest Mining District Ventilation Borehole and Access Road Location <br />16a(1) <br />Southwest Mining District Gate -Roads, Bleeder, and Drainage Rooms <br />16b <br />Gate -Road Extension Area <br />16c <br />9 & 10 Right Gateroad Extensions <br />16d <br />1995 Seismic Lines - EMD <br />16e <br />EMD Bleeder Shaft Grading Plan <br />16e(1) <br />EMD Bleeder Shaft Site Plan <br />16f <br />EMD Ventilation Site and Panel Description <br />16g <br />Section 14 Mining Area: Structures & Renewable Resources <br />16h <br />8 Right Inby <br />16h(1) <br />6 Right & 7 Right Inby Development <br />. <br />16i <br />1996 Seismic Lines and Mine Water Return Line <br />MR08-228 xv 03/06/08 <br />