Laserfiche WebLink
April 5, 2016 <br />2.4 Placement and Compaction of Fill Materials <br />There was no placement of material or contour work done this quarter on the dump. <br />At the end of the first quarter of 2016, the north half of the dump was at the 7600' through 7630' <br />levels. On the south half of the fill was at the 7600' through the 7740' elevation. <br />Photograph 6 depicts the west facing slope of the fill in the area where the slope of the fill is at <br />3H: 1V. <br />Photograph 6: West Side Fill 3H: 1 V Face Looking Southeast (3/31/2016) <br />2.5 Revegetation <br />There No topsoil was placed on the fill this quarter. <br />3.0 References <br />Agapito Associates, Inc. (2009), "Horse Gulch Fill Stability Analysis" submitted to Trapper <br />Mining, Inc., May 29. <br />Colorado Division of Minerals and Geology (1980), "Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining," revised 9/14/05, Section 4.09.1. <br />5 <br />