Laserfiche WebLink
April 5, 2016 <br />11, <br />t <br />Photograph 2: North Site above the 7350 Bench Elevation (3/31/2016) <br />Photograph 3: Spring above the 7470 Bench Elevation (3/31/2016) <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />Topsoil and organic material removal activities were not conducted during the quarter. <br />2.2 Placement of Underdrainage Systems <br />3 <br />