Laserfiche WebLink
FIGURES <br />Figure 4.18-1 Raptor Protection Retrofitting of Existing Power Poles <br />Raptor Protection Retrofitting of Existing Power Poles <br />Proposedlmprovents <br />Assigned <br />Pole <br />Number <br />Primary <br />Unit - Top <br />N <br />CM <br />z <br />m <br />CL <br />< <br />N <br />g <br />c <br />C. <br />w <br />aLC <br />9 <br />m <br />S <br />2 <br />0 <br />CL <br />9 <br />c <br />a <br />a0 <br />A <br />`o <br />Refer to Figure Identified Below on <br />Pages 4.18.6 Through 4.18-9 <br />` <br />LL <br />a <br />o <br />n <br />Administration Substation to North <br />Al <br />C7 OSW <br />3 <br />Refer to Figure 5 <br />2005 <br />03 <br />A3 <br />C9 OSW <br />2 <br />1 <br />Refer to Figure 4 <br />2005 <br />Q3 <br />A4 <br />C9 OSW <br />2 <br />2 <br />2 <br />Refer to Figure 4 <br />2005 <br />Q3 <br />A5 <br />C9 OSW <br />2 <br />1 <br />Refer to Figure 4 <br />2005 <br />Q3 <br />Al2 <br />C9 OSW <br />2 <br />1 <br />Refer to Fi ure 4 <br />2005 <br />03 <br />A13 <br />C9 OSW <br />2 <br />1 <br />Refer to Figure 4 <br />2005 <br />Q3 <br />A15 <br />C7 OSW <br />6 <br />Refer to Figure 5 <br />2005 <br />Q3 <br />A15 -1A <br />C9-1 OSW <br />1 <br />1 <br />Refer to Figure 4 <br />2005 <br />Q3 <br />A15 -2A <br />C9-1 OSW <br />1 <br />1 <br />Refer toFigure 4 <br />2005 <br />Q3 <br />A15 -3A <br />C7 OSW <br />3 <br />2 <br />9 <br />1 <br />Refer to Figures 4 and 5 <br />2005 <br />Q3 <br />A16 <br />C9 OSW <br />2 <br />Refer to Figure 4 <br />2005 <br />Q3 <br />A17 <br />C8 OSW <br />6 <br />Refer to Figure 5 <br />2005 <br />Q3 <br />A17 -2L <br />C7 <br />1 <br />6 <br />Refer to Figure 5 <br />2005 <br />03 <br />A19 <br />C7 OSW <br />6 <br />2 <br />Refer to Figures 4 and 5 <br />2005 <br />Q3 <br />A20 <br />C7 OSW <br />3 <br />6 <br />Refer to Figure 5 <br />2005 <br />Q3 <br />A21 <br />C9 OSW <br />1 <br />9 <br />2 <br />1 <br />1 <br />Refer to Figures 4 and 5 <br />2005 <br />Q3 <br />A22 <br />C7 OSW <br />3 <br />1 <br />Refer to Figures 4 and 5 <br />2005 <br />Q3 <br />A23 <br />C7 OSW <br />2 1 <br />6 <br />2 <br />1 <br />Refer to Figures 4 and 5 <br />2005 <br />Q3 <br />Administration Substation to South <br />(Note: 69kV limited issue for avian electrocution; therefore 69kY not surveyed) <br />H1 <br />69kV <br />3 <br />1 <br />1 <br />1 <br />Refer to Figure 4 <br />2005 <br />Q4 <br />H2 <br />69kV <br />3 <br />6 <br />2 <br />1 <br />IRefer <br />to Figures 4 and 5 <br />2005 <br />Q4 <br />H3 <br />69kV <br />3 <br />2 <br />1 <br />Refer to Figures 4 and 5 <br />2005 <br />Q4 <br />H3-1 R <br />C8-1 <br />4 <br />Refer to Figure 4 <br />2005 <br />Q4 <br />H4 <br />69kV <br />1 <br />2 <br />15 <br />4 <br />Refer to Figures 4 and 5 <br />2005 <br />Q4 <br />H4-1 L <br />69kV <br />4 <br />Refer to Figure 4 <br />2005 <br />Q4- <br />1-14-21. <br />69kV2 <br />Refer to Figure 4 <br />2005 <br />Q4 <br />H4 -4L <br />C9 OSW <br />2 <br />Refer to Figure 4 <br />2005 <br />Q4— <br />H4-5L <br />C9-1 OSW <br />1 <br />Refer to Figure 4 <br />2005 <br />04 <br />H4-61- <br />C7 OSW <br />3 <br />3 <br />9 <br />1 <br />Refer to Figures 4 and 5 <br />2005 <br />Q4 <br />H5 <br />69kV <br />4 <br />Refer to Figure 4 <br />2005 <br />04 <br />H6 <br />C8-1 <br />4 <br />1 <br />Refer to Figure 4 <br />2005 <br />Q4 <br />H7 <br />C9 <br />4 <br />Refer to Figure 4 <br />2005 <br />04 <br />H8 <br />C9-1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />Refer to Figures 1, 2, 4 and 5 <br />2005 <br />Q4 <br />H9 <br />C9-1 <br />2 <br />1 <br />Refer to Figure 1, 2 and 4 <br />2005 <br />04 <br />H10 <br />C9-1 <br />2 <br />Refer to Figure 4 <br />2006 <br />03 <br />H11 JC7 <br />NU I <br />1 <br />1 <br />3 <br />2 <br />3 <br />Refer to Figures 4 and 5 <br />2006 <br />Q3 <br />Figures 35 Revision Date: 02/26/16 <br />Revision No.: MR -151 <br />