My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-04_PERMIT FILE - C1981019 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2016-04-04_PERMIT FILE - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:33 PM
Creation date
4/12/2016 7:29:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/4/2016
Section_Exhibit Name
4.12 Slides and Other Damages
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />Tri-State Generation and Transmission Assoication, Inc. (Tri-State), owns and operates a 345 kV power <br />line which is located within the permit boundary and is shown on Map 22. Tri-State is required to <br />maintain proper phase to ground clearences under all their power lines, and will be conducting ground <br />disturbances activites within their 150' right-of-way, within the permit boundary, in two approximate <br />locations as shown on Figure 4.12-3. The final loctions will be determined by Tri-State. These ground <br />disturbing activites are not associated with the Colowyo Mine and will not be required to be permitted <br />and bonded for in accordance with Rule 3.02.1(2). <br />In February of 2016, the Colowyo Mine site experienced a very high wind event which snapped a power <br />pole off at the base and left the power pole dangling from the line. Colowyo constructed an emergency <br />road into the pole location (0.4 acres of disturbance) to access the location, stabilize the line, and replaced <br />the broken pole. Topsoil was windrowed with a dozer down gradient of the road footprint to minimimze <br />surface water flow from the area of disturbance to native areas. Once ground conditions allow access, the <br />entire road footprint will have the topsoil re -spread on the area, and it will be seeded in accordance with <br />the approved reclamation seed mixture. Please see Figure 4.12-4 for a location of the emergency road <br />that was constructed to repair the power pole. <br />Rule 4 Performance Standards 4.12-2 Revision Date: 02/23/16 <br />Revision No.: MR -151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.