Laserfiche WebLink
mark an "X" in the provided column. This Checklist and associated plans and <br />specifications will be included as exhibits to the NTP. <br />7) Performance Bonds <br />The performance bond must be at least 110% of the estimated total highway <br />construction costs. Bonding agency must be licensed to do business in the State of <br />Colorado. A cost estimate, sealed by a Colorado registered professional engineer, and a <br />draft of each bond must be provided and approved by CDOT, prior to issuing a NTP. <br />8) Pre -construction Meeting <br />Meeting shall be scheduled between, but not limited to, Applicant, a CDOT <br />representative, construction personnel, Traffic Control Supervisor, and Permittee (if <br />other than Applicant). <br />Please call to schedule a pre -design meeting with a CDOT engineer at (970) 683-6284. This <br />meeting will go over all items that shall need to be submitted with the NTP. <br />Respectfully, <br />a_ 6UO't� <br />Dan Roussin <br />Region 3 Access Manager <br />