Laserfiche WebLink
Randy S ffder -2- December 11, 1996 <br />• Morrison Knudsen Corporation performed the road and bench design. I have asked them to prepare <br />a letter which explains the numerous options they reviewed and considered in order to avoid bed and <br />bank and wetlands disturbance. I will forward there letter to you as soon as it is received. <br />Bowie Resources Limited may perform additional wetland delineation work next spring in order to <br />further define the wetland areas. Specifically, soils may be analyzed to make sure the areas identified <br />as wetlands are in fact regulatory wetlands. Until the additional delineation work is complete and <br />reviewed by the Corps, we will assume the current wetland boundary delineation, as approved by <br />your office, is accurate. <br />Please call if you have any questions. <br />Sincerely, <br />Jun Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />0 � <br />