Laserfiche WebLink
Abandonment <br />DRMS Bond <br />DMRS <br />Diameter/ <br />Depth <br />Report <br />Hole ID <br />AKA <br />Release Status <br />Insp Date <br />Surface <br />Depth <br />Sealed <br />Pad Area I <br />Road Area <br />Map 09 Identifier Permitting Action <br />For Drill Pad <br />Casing <br />Acres jAcres <br />Yes <br />GVB-BI-C <br />GVB-BI-D <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.875 <br />1640 <br />120 Drilled from existing drill sit <br />141 <br />3 GVBs <br />3520 <br />1.5 <br />0.9 <br />TR41 <br />Yes <br />GVB-132-Al <br />GVB-62-A <br />Phase I, II <br />Aug. 4-6, 2015 <br />6.625/9.625 <br />1384 <br />135 <br />0.5 <br />147 <br />Yes <br />GVB-B3-A1 <br />GVB-B3-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/16 <br />1072 <br />1341 <br />0.5 <br />149 <br />Yes <br />GVB-B3-A2 <br />GVB-B3-A <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/16 <br />1064 <br />1211 <br />0.5 <br />0.9 <br />148, 150 <br />0.5 <br />0.0 <br />TR41 - Bowie No. 1 Mi <br />DRMS estimate w/PR] <br />BRL-1-03-01 <br />6 <br />1480 <br />0.5 <br />2.1 <br />197,200 <br />0.5 <br />1.1 <br />TR49 - Bowie No. 1 Mi <br />DRMS estimate w/PR] <br />N/A <br />BRL-1-08-03 <br />N/A <br />8.75 <br />1520 <br />0.5 <br />0.4 <br />198,201 DELETED TR -96 <br />Yes <br />BRL-1-08-04 <br />Open <br />8.75 <br />1870 <br />0.5 <br />0.7 <br />199,202 <br />Hubbard Creek Shaft <br />TR -47 <br />Ventilation Shaft <br />Phase I, II <br />Aug. 4-6, 2015 <br />10.5 Feet <br />500 <br />13 GVBs <br />13672 <br />5.00 <br />15.80 <br />TR52 <br />Ref TR -65 for deleted holes Map 9 <br />Yes <br />GVB-9C <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/14 <br />1741 <br />1450 <br />1 <br />14 <br />174,182 <br />Yes <br />GVB-8A <br />GVB-B-BA <br />Phase I, II <br />Aug. 4-6, 2015 <br />7/9.625 <br />790 <br />790 <br />1 <br />0.9 <br />176,184 <br />Yes <br />GVB-9D <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/16.5 <br />1024 <br />1024 <br />0 <br />0 <br />176,184 <br />Yes <br />GVB-10D-1 <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/14 <br />1698 <br />1530 <br />1 <br />0 <br />177 <br />Yes <br />GVB-1013-2 <br />GVB-10C <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/14 <br />1760 <br />1400 <br />0 <br />0 <br />177 <br />Yes <br />GVB-8B <br />GVB-DB-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/14 <br />1622 <br />1610 <br />1 <br />0 <br />179 <br />GVB-9E <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.375 <br />1660 <br />0 <br />0 <br />179 <br />Yes <br />GVB-10E <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/14 <br />1639 <br />1376 <br />1 <br />0.9 <br />180, 183 <br />Yes <br />GVB-IOU-1 <br />GVB-10U <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/14 <br />1738 <br />1738 <br />0 <br />0 <br />180, 183 <br />230 <br />0.5 <br />0 <br />TR53 <br />Yes <br />HC -08-01 <br />Phase I, II <br />Aug. 4-6, 2015 <br />12.75/14 <br />230 <br />230 <br />0.5 <br />186 185 (0.4 Ac) was not cc <br />N/A <br />HC -08-02 <br />MW -82 <br />N/A <br />187 Permitted under MR -8 <br />Terror Creek Shaft <br />1 <br />TR65 <br />N/A <br />GEOTECH HOLE <br />N/A <br />3.8 <br />700 <br />1 <br />195 Eliminated by Shaft Co <br />Terror Creek Shaft <br />TR -67 <br />Ventilation Shaft <br />N/A <br />18.5 Feet <br />550 <br />195 <br />10 GVBs 3 exploration holes <br />1 <br />18174 <br />13 <br />7.5 <br />TR73 <br />Yes <br />GVB-B12E <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />865 <br />122 <br />1 <br />0.9 <br />220,232 <br />Yes <br />GVB-813B <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1216 <br />970 <br />1 <br />0.3 <br />221,233 <br />Yes <br />GVB-813C <br />Phase I, II <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1120 <br />8911 <br />1 <br />0 <br />222 <br />Yes <br />GVB-1313D <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1057 <br />959 <br />1 <br />0 <br />223 <br />Yes <br />GVB-1313E <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1407 <br />918 <br />1 <br />0 <br />198 <br />Yes <br />GV13-B14A <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1235 <br />995 <br />1 <br />0.9 <br />224,234 <br />Yes <br />GVB-8146 <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1510 <br />1251 <br />1 <br />0.4 <br />225,235 <br />Yes <br />GVB-B14C <br />Phase] <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1430 <br />1192 <br />1 <br />1.1 <br />226,236 <br />Yes <br />GVB-B14D <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1305 <br />1035 <br />1 <br />0.4 <br />227,237 <br />Yes <br />GV13-B14E <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1310 <br />1048 <br />1 <br />0.4 <br />228,238 <br />Yes <br />SS -7 <br />Phase I, II <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1947 <br />1947 <br />1 <br />1.9 <br />229, 239 <br />Yes <br />SS -6 <br />Phase I <br />Aug. 4-6, 2015 18.625/5.5/12.21 <br />1807 <br />1807 <br />11 <br />0.91 <br />230, 240 <br />MR -185 2.05-45vii 12/2015 <br />nstructed <br />istruction <br />