Laserfiche WebLink
e%am.A/arm■ w 21...or <br /> M-1993-035 -- -_-- <br /> APR042016 -- <br /> TR02 HANDLE SHRUB WITH CARE TO ENSURE <br /> DIVISION OF RECLAMATION NO DAMAGE IS INFLICTED TO ABOVE <br /> OB.3. All upland reclamation areas shall be stabilized with hydro-mulch. The use of <br /> SHRUB <br /> GROUND PORTIONS ❑F THE wood fiber hydro-mulch shall be applied at a rate of 2000 pounds per acre.All <br /> MINING AND SAFETY <br /> CUT FABRIC T❑ INSTALL WATER THOROUGHLY UPON hydro-mulch shall also include a mulch tackifer consisting of organic, non-toxic, <br /> SHRUB RESECURE FARBIC ONCE INSTALLATION free-flowing, non-corrosive material. Hydro-mulch shall cover all seeded areas with a Achnotherumhpmen;udes Indian rice..rass 10 81 <br /> INSTALLED WITH STAKES uniform surface layer. Seeding shall not occur as part of hydro-mulch applications. Bramusmarginatus rncwntainbrome zD 354 <br /> '''''\ <br /> �- CREATE PLANTING PIT 1.5X THE SIZE <br /> OF THE ROOTBALL AND BACKFILL WITH An estimated 25,400 pounds of hydro-mulch is required to stabilize approximately El mus trach • los sfenderwheat.+ass 20 143 <br /> AN APPROVED PLANTING SOIL. LIGHTLY 12.7 acres of Uplands(includingTransition)within the project area. Water for Leymusdnereaus GreatBasin Wiidr 5 44 <br /> COMPACT TO ENSURE NO AIR GAPS. p p <br /> TOP OF ROOT BALL SHALL BE ' hydro mulch application is assumed available at the project site. Lupinusagenteus silvery lupine 0.5 32 <br /> RECESSED 2' BELOW FINAL !s REMOVE SHRUB Poscop rumsmithN 25 258 <br /> GRADE. COVER TOP OF ROOT ,.. .,,.�;::,,,, :.�. CONTAINER-IF Poo endkriana 5 7 <br /> ROOT-BOUND, CUT ROOT C. RIPARIAN ZONE RECLAMATION <br /> BALL WITH WOOD CHIP MULCH > t Festucasaximantana Rocky Mountain fescue 15 33 1 <br /> + r_ I BALL IN TWO VERITCAL Tata! 02 <br /> L❑CATIONS Cl.. Riparian Zone areas shall have a minimum depth of 3"of growth medium in <br /> GROWTH MEDIUM } ti place prior to seeding. ,, R z <br /> EXISTING SUBSTRATE }j>.$ $ }Z {� <-. ENSURE ROOT BALL L7' "r*s 1 r`G +• <br /> }} j r J�IS-1�� -iSITS ON o.5' MIN. C.2. All areas designated as Riparian Zone shall be seeded with the Riparian Seed r, - c- -- _•, - t ,,arts-a.:1 * dri, IV> " <br /> LAYER OF PLANTING Mix(Table 2). Riparian Seed Mix shall be distributed by broadcast(or drill) methods <br /> SOIL. in two opposite directions across the area. Seed shall be lightly incorporated into the <br /> growth medium by chain drag,drill,hydro-seeding or similar method to ensure as <br /> SHRUB PLANTING TYPICAL DETAIL O <br /> 9 adequate soil to seed contact. <br /> oi <br /> A. GROWTH MEDIUM C.3. The Riparian Fringe within the Riparian Zone shall be stabilized by covering the Bromus mar•inatus mountain brome 20 104 0 <br /> surface with erosion control blanket extending a distance of 6 feet from the bankfull tato ••rostisconadensrs b --•'nt 5 1. <br /> edge towards the Upland. The use of an extended term (18-24-month)double net Deschampsracaesprtasa tuhedhairgrass 10 3 0 <br /> Al.. All designated Upland(including Transition)and Riparian Zone reclamation El mus trot caulus slender wheat crass 25 55 <br /> '-7... <br /> biodegradable natural fiber fabric such as North American Green Bionet C125BN or m <br /> areas require the placement of a growth medium.Table 4 provides an estimate of Elymusconodensis Canada wild - 10 31 3 <br /> other equivalent product shall be installed. No polyproplylene netting structure shall Pasco umsmlthi westernwhea ,ass 25 so <br /> growth medium quantity required. be used. All fabric shall be installed per manufacture's specifications,trenched and Poaolpno Al."ineblue;ass 5 2 s <br /> A.2. Growth medium shall generally consist of on-site processed fine grained mineral secured with biodegradable stakes. All products shall be approved by ERC prior to rota! 251 <br /> 3 site delivery. lapo <br /> soil screened tor minus. As much as possible, mineral soils shall be free of any • Refer to Outside Bend Typical Detail. rr a. r r; s a <br /> obvious weeds. It is assumed that local wood chips will be available and provided by gin.; .4.4m1}.4.c .e. .kit&easr o', 3 <br /> the County. Wood chips shall be combined and thoroughly mixed into the mineral C.4. Outside Bend Riparian Fringe includes the installation nursery stock ''n <br /> soil stockpile. Wood chips shall be added at a minimum rate of 5%to a maximum of o <br /> containerized native shrub plantings and/or transplanted material and willow <br /> rate 10%of the total volume of mineral soil.Approximately 400 cubic yards of wood staking. The Riparian Shrub Planting Schedule(Table 3)provides a list and <br /> chips shall be incorporated. quantities of species to be planted. Shrubs are proposed to be installed at <br /> approximately 5' on center spacing along Outside Bend Riparian Fringe as field Igoe.3.'Shrub Planting Schedule V <br /> A.3. Growth medium shall be evenly applied,loose, not compacted and free of clods marked by ERC. Shrubs shall be installed per the Shrub Planting Typical Detail. 1�t."t:,itie o <br /> to specified depths. Growth medium depths shall be confirmed by ERC upon surfacea <br /> application. fiends a <br /> C.5. The Riparian Zone (outside of the Riparian Fringe)shall be stabilized with5ciNI <br /> rnti15c hammi., <br /> Catrfrtkan iUatr►e (5,t�.t.1 0 <br /> hydro-mulch. The use of wood fiber hydro-mulch shall be applied at a rate of 2000 <br /> A.4. After all Growth medium surface application,soil amendments shall be dwarf birch a <br /> into, orated. Soil amendments shall include a mixture of or anic fertilizer, pounds per acre.All hydro-mulch shall also include a mulch tackifer consisting of <br /> p g organic, non-toxic,free-flowing, non-corrosive material. Hydro-mulch shall cover all Betula glandulosa 3 <br /> and shmycorall <br /> aebe and humatRichlawn 7-2-1 custom blend or similar is recommended seeded areas with a uniform surface layer. Seeding shall not occur as part of Satix boothii Booth's willow 110 0 <br /> and shall be determined based on soil nutrient laboratory analysis. Produced mineral hydro-mulch applications. An estimated 6,800 pounds of hydro-mulch is required to Salixdrummondiana Drummond willow 110 <br /> soil shall be analyzed for organic and nutrient content to determine appropriate stabilize approximately 3.4 acres of Riparian Zone within the project area. Water for Salixgeyeriana Geyer's willow 110 c <br /> amendment ratios. Until laboratory analysis confirmation application rates are hydro-mulch application is assumed available at theproject site. <br /> assumed at 1,500 pounds per acre. ERC to confirm final soil amendments prior to Salix monticola .ark willow 75 <br /> application. Total 480 E <br /> D. Willow Transplants <br /> All shrubs#5-size nun- grown v, <br /> B. UPLAND RECLAMATION D.1. Willow clumps shall be harvested on site and transplanted where feasible. o <br /> B.1. Upland (including Transition)areas shall have a minimum depth of 3"of Transplants shall be identified during initial construction efforts and transplant u <br /> locations determined in the field by ERC. Willow clumps shall be harvested with an <br /> growth medium in place prior to seeding. Table 4-Growth Medium Application De sand volumes a <br /> excavator salvaging the entire root ball(including any soil/cobble)and moved ' <br /> B.2. All areas designated as Uplands(including Transition)shall be seeded with the directly to transplant location. Prior to salvage,the above ground portion each shrub o <br /> Upland Seed Mix(Table 1). Upland Seed Mix shall be distributed by broadcast(or shall be trimmed to a height of 2'. Transplant locations may at outside bends, Type Estimated Area Depth(in) Mineral Soil Volume(cy) cc <br /> drill) methods in two opposite directions across the area. Seed shall be lightly17 <br /> along the riparian fringe(but not within the riparian fringe ECB)or at designated (ac) o <br /> locations with appropriate hydrology. Salvaged willow clump root balls shall remain U•land 12.7 3 5,122 <br /> incorporated into the growth medium by chain drag,drill,hydro-seeding or similar moist during transplant. 3.4 3 1,371 0 <br /> method to ensure adequate soil to seed contact. TOTAL 6,493u r u <br /> cc <br /> REV DATE DESCRIPTION 1 x <br /> '8 <br /> .0 <br /> a <br /> 2, <br /> PREPARED BY CLIENT PROJECT TITLE SHEET NO 0 <br /> ECOLOGICAL RESOURCES CONSULTANTS,INC SUMMIT COUNTY OPEN SWAN RIVER PLANTING AND SEEDING <br /> 35715 us HIGHWAY 40,SUITE D204 SPACE AND TRAILS RESTORATION PROJECT 1 Q <br /> EVERGREEN,CO 80439 DETAILS <br /> A 02/99/16 ISSUED FOR PQtYIT17NC 5 <br />