|
e%am.A/arm■ w 21...or
<br /> M-1993-035 -- -_--
<br /> APR042016 --
<br /> TR02 HANDLE SHRUB WITH CARE TO ENSURE
<br /> DIVISION OF RECLAMATION NO DAMAGE IS INFLICTED TO ABOVE
<br /> OB.3. All upland reclamation areas shall be stabilized with hydro-mulch. The use of
<br /> SHRUB
<br /> GROUND PORTIONS ❑F THE wood fiber hydro-mulch shall be applied at a rate of 2000 pounds per acre.All
<br /> MINING AND SAFETY
<br /> CUT FABRIC T❑ INSTALL WATER THOROUGHLY UPON hydro-mulch shall also include a mulch tackifer consisting of organic, non-toxic,
<br /> SHRUB RESECURE FARBIC ONCE INSTALLATION free-flowing, non-corrosive material. Hydro-mulch shall cover all seeded areas with a Achnotherumhpmen;udes Indian rice..rass 10 81
<br /> INSTALLED WITH STAKES uniform surface layer. Seeding shall not occur as part of hydro-mulch applications. Bramusmarginatus rncwntainbrome zD 354
<br /> '''''\
<br /> �- CREATE PLANTING PIT 1.5X THE SIZE
<br /> OF THE ROOTBALL AND BACKFILL WITH An estimated 25,400 pounds of hydro-mulch is required to stabilize approximately El mus trach • los sfenderwheat.+ass 20 143
<br /> AN APPROVED PLANTING SOIL. LIGHTLY 12.7 acres of Uplands(includingTransition)within the project area. Water for Leymusdnereaus GreatBasin Wiidr 5 44
<br /> COMPACT TO ENSURE NO AIR GAPS. p p
<br /> TOP OF ROOT BALL SHALL BE ' hydro mulch application is assumed available at the project site. Lupinusagenteus silvery lupine 0.5 32
<br /> RECESSED 2' BELOW FINAL !s REMOVE SHRUB Poscop rumsmithN 25 258
<br /> GRADE. COVER TOP OF ROOT ,.. .,,.�;::,,,, :.�. CONTAINER-IF Poo endkriana 5 7
<br /> ROOT-BOUND, CUT ROOT C. RIPARIAN ZONE RECLAMATION
<br /> BALL WITH WOOD CHIP MULCH > t Festucasaximantana Rocky Mountain fescue 15 33 1
<br /> + r_ I BALL IN TWO VERITCAL Tata! 02
<br /> L❑CATIONS Cl.. Riparian Zone areas shall have a minimum depth of 3"of growth medium in
<br /> GROWTH MEDIUM } ti place prior to seeding. ,, R z
<br /> EXISTING SUBSTRATE }j>.$ $ }Z {� <-. ENSURE ROOT BALL L7' "r*s 1 r`G +•
<br /> }} j r J�IS-1�� -iSITS ON o.5' MIN. C.2. All areas designated as Riparian Zone shall be seeded with the Riparian Seed r, - c- -- _•, - t ,,arts-a.:1 * dri, IV> "
<br /> LAYER OF PLANTING Mix(Table 2). Riparian Seed Mix shall be distributed by broadcast(or drill) methods
<br /> SOIL. in two opposite directions across the area. Seed shall be lightly incorporated into the
<br /> growth medium by chain drag,drill,hydro-seeding or similar method to ensure as
<br /> SHRUB PLANTING TYPICAL DETAIL O
<br /> 9 adequate soil to seed contact.
<br /> oi
<br /> A. GROWTH MEDIUM C.3. The Riparian Fringe within the Riparian Zone shall be stabilized by covering the Bromus mar•inatus mountain brome 20 104 0
<br /> surface with erosion control blanket extending a distance of 6 feet from the bankfull tato ••rostisconadensrs b --•'nt 5 1.
<br /> edge towards the Upland. The use of an extended term (18-24-month)double net Deschampsracaesprtasa tuhedhairgrass 10 3 0
<br /> Al.. All designated Upland(including Transition)and Riparian Zone reclamation El mus trot caulus slender wheat crass 25 55
<br /> '-7...
<br /> biodegradable natural fiber fabric such as North American Green Bionet C125BN or m
<br /> areas require the placement of a growth medium.Table 4 provides an estimate of Elymusconodensis Canada wild - 10 31 3
<br /> other equivalent product shall be installed. No polyproplylene netting structure shall Pasco umsmlthi westernwhea ,ass 25 so
<br /> growth medium quantity required. be used. All fabric shall be installed per manufacture's specifications,trenched and Poaolpno Al."ineblue;ass 5 2 s
<br /> A.2. Growth medium shall generally consist of on-site processed fine grained mineral secured with biodegradable stakes. All products shall be approved by ERC prior to rota! 251
<br /> 3 site delivery. lapo
<br /> soil screened tor minus. As much as possible, mineral soils shall be free of any • Refer to Outside Bend Typical Detail. rr a. r r; s a
<br /> obvious weeds. It is assumed that local wood chips will be available and provided by gin.; .4.4m1}.4.c .e. .kit&easr o', 3
<br /> the County. Wood chips shall be combined and thoroughly mixed into the mineral C.4. Outside Bend Riparian Fringe includes the installation nursery stock ''n
<br /> soil stockpile. Wood chips shall be added at a minimum rate of 5%to a maximum of o
<br /> containerized native shrub plantings and/or transplanted material and willow
<br /> rate 10%of the total volume of mineral soil.Approximately 400 cubic yards of wood staking. The Riparian Shrub Planting Schedule(Table 3)provides a list and
<br /> chips shall be incorporated. quantities of species to be planted. Shrubs are proposed to be installed at
<br /> approximately 5' on center spacing along Outside Bend Riparian Fringe as field Igoe.3.'Shrub Planting Schedule V
<br /> A.3. Growth medium shall be evenly applied,loose, not compacted and free of clods marked by ERC. Shrubs shall be installed per the Shrub Planting Typical Detail. 1�t."t:,itie o
<br /> to specified depths. Growth medium depths shall be confirmed by ERC upon surfacea
<br /> application. fiends a
<br /> C.5. The Riparian Zone (outside of the Riparian Fringe)shall be stabilized with5ciNI
<br /> rnti15c hammi.,
<br /> Catrfrtkan iUatr►e (5,t�.t.1 0
<br /> hydro-mulch. The use of wood fiber hydro-mulch shall be applied at a rate of 2000
<br /> A.4. After all Growth medium surface application,soil amendments shall be dwarf birch a
<br /> into, orated. Soil amendments shall include a mixture of or anic fertilizer, pounds per acre.All hydro-mulch shall also include a mulch tackifer consisting of
<br /> p g organic, non-toxic,free-flowing, non-corrosive material. Hydro-mulch shall cover all Betula glandulosa 3
<br /> and shmycorall
<br /> aebe and humatRichlawn 7-2-1 custom blend or similar is recommended seeded areas with a uniform surface layer. Seeding shall not occur as part of Satix boothii Booth's willow 110 0
<br /> and shall be determined based on soil nutrient laboratory analysis. Produced mineral hydro-mulch applications. An estimated 6,800 pounds of hydro-mulch is required to Salixdrummondiana Drummond willow 110
<br /> soil shall be analyzed for organic and nutrient content to determine appropriate stabilize approximately 3.4 acres of Riparian Zone within the project area. Water for Salixgeyeriana Geyer's willow 110 c
<br /> amendment ratios. Until laboratory analysis confirmation application rates are hydro-mulch application is assumed available at theproject site.
<br /> assumed at 1,500 pounds per acre. ERC to confirm final soil amendments prior to Salix monticola .ark willow 75
<br /> application. Total 480 E
<br /> D. Willow Transplants
<br /> All shrubs#5-size nun- grown v,
<br /> B. UPLAND RECLAMATION D.1. Willow clumps shall be harvested on site and transplanted where feasible. o
<br /> B.1. Upland (including Transition)areas shall have a minimum depth of 3"of Transplants shall be identified during initial construction efforts and transplant u
<br /> locations determined in the field by ERC. Willow clumps shall be harvested with an
<br /> growth medium in place prior to seeding. Table 4-Growth Medium Application De sand volumes a
<br /> excavator salvaging the entire root ball(including any soil/cobble)and moved '
<br /> B.2. All areas designated as Uplands(including Transition)shall be seeded with the directly to transplant location. Prior to salvage,the above ground portion each shrub o
<br /> Upland Seed Mix(Table 1). Upland Seed Mix shall be distributed by broadcast(or shall be trimmed to a height of 2'. Transplant locations may at outside bends, Type Estimated Area Depth(in) Mineral Soil Volume(cy) cc
<br /> drill) methods in two opposite directions across the area. Seed shall be lightly17
<br /> along the riparian fringe(but not within the riparian fringe ECB)or at designated (ac) o
<br /> locations with appropriate hydrology. Salvaged willow clump root balls shall remain U•land 12.7 3 5,122
<br /> incorporated into the growth medium by chain drag,drill,hydro-seeding or similar moist during transplant. 3.4 3 1,371 0
<br /> method to ensure adequate soil to seed contact. TOTAL 6,493u r u
<br /> cc
<br /> REV DATE DESCRIPTION 1 x
<br /> '8
<br /> .0
<br /> a
<br /> 2,
<br /> PREPARED BY CLIENT PROJECT TITLE SHEET NO 0
<br /> ECOLOGICAL RESOURCES CONSULTANTS,INC SUMMIT COUNTY OPEN SWAN RIVER PLANTING AND SEEDING
<br /> 35715 us HIGHWAY 40,SUITE D204 SPACE AND TRAILS RESTORATION PROJECT 1 Q
<br /> EVERGREEN,CO 80439 DETAILS
<br /> A 02/99/16 ISSUED FOR PQtYIT17NC 5
<br />
|