My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-02_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2016-04-02_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 10:33:01 AM
Creation date
4/7/2016 1:01:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
Hydrology
Doc Date
4/2/2016
Doc Name
1st Quarter 2016 Groundwater Sampling
From
Golder Associates
To
DRMS
Annual Report Year
2016
Report Quarter_Month
1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02" RECEIVED <br /> APR01tale <br /> ® = Golder I <br /> Associates arms OF <br /> PAINING AND SAFETY <br /> March 30, 2016 Project No. 1547675 <br /> Mr. Eric Scott <br /> Colorado Division of Reclamation Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 , P g r� r_ 34� <br /> Denver, Colorado 80203 !! <br /> RE: tIRST QUARTER 2016 GROUNDWATER SAMPLING AT THE BOETTCHER QUARRY <br /> Dear Mr. Scott: <br /> On behalf of Holcim (US) Inc., Golder Associates Inc. is pleased to submit analytical laboratory results for <br /> the first quarter 2016 groundwater sampling event at the Boettcher Limestone Quarry near La Porte, <br /> Colorado. Attached are tables summarizing the results and a copy of the laboratory report. In addition to <br /> sampling wells MW-1 through MW-7, a field duplicate at MW-4 (MW-15) and a field blank (MW-20) were <br /> collected. The locations of monitoring wells MW-1 through MW-7 are presented in Figure 1. <br /> If you have any questions, please do not hesitate to call the undersigned at (303) 980-0540. <br /> Sincerely, <br /> GOLDER ASSOCIATES INC. <br /> a Harkins, P.G. Randy March, P.E., P.G. <br /> Geologist Principal Geological Engineer <br /> Attachments: <br /> Table 1: Summary of Monitoring Results for MW-1 <br /> Table 2: Summary of Monitoring Results for MW-2 <br /> Table 3: Summary of Monitoring Results for MW-3 <br /> Table 4: Summary of Monitoring Results for MW-4 <br /> Table 5: Summary of Monitoring Results for MW-5 <br /> Table 6: Summary of Monitoring Results for MW-6 <br /> Table 7: Summary of Monitoring Results for MW-7 <br /> Figure 1: Location Map <br /> Attachment A: ACZ Laboratory Report <br /> \15\1547675\0110\lstq 2016 gwsampling-boettcher fnl-30mar16\1547675 boettcherquarrygwsamp 1q2016 fnl-30mar16.docx <br /> Golder Associates Inc. <br /> 44 Union Boulevard,Suite 300 (.1)) <br /> Lakewood,CO 80228 USA • <br /> Tel: (303)980-0540 Fax: (303)985-2080 www.golder.com <br /> Golder Associates:Operations in Africa,Asia,Australasia,Europe,North America and South America <br /> Golder,Golder Associates and the GA globe design are trademarks of Golder Associates Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.