Laserfiche WebLink
Meets the applicable criteria for a S,,,all Area Exemption, the proposed drainage control measures should be effective in <br />controlling runolT and sedimentation, and construction of full-scale d,ai„agc and aedi,,,r,„ T co„T,ol sT, uctures is neither <br />needed nor justified. <br />13 -Left Outbv Utility Borehole (MR15-L9i) — Givc„ the li,,,;ted disturbance areas, the location Ot the road and pad <br />Oil a lOw-Ly a;dchill_ ,,,d the ve,y temporary nature Of the planned disturbance, the 13LT Outby Utility Borehole <br />pad_ and associated road will have minimal impact relative to runoff au,d sediment CouL,buLo The I;,nited amount <br />of drainage from upgradient areas will be iiae,Ccpted a„d ,otuted around the borehole pad by a Small upgradient <br />diveraio„ ditch o„ tl,r, ao„div.est and northwest sides of the pad. The existing ranch road crosses a small epl,a„e,al <br />drainage, and the existing culvert will remain inct <br />-place. t he ,lvert ,,,3talla'v„ t,will evaldated relative to condition <br />and cover to carry the auiticipatud truck traffic, tl,e culvert will be replaced or extended as necessary, and adequate <br />vier ..ill be placed to carry the anticipated loads, without crushing the ct,lvert. Lhai„ag'c fio,,, the bo,el,ole pad <br />area will be controlled under a Small-Arca txemptio,,, will, gavel surfacing On the pad and road to control runoff <br />an,d aedi,,,r,nt acid pl.,ce,,,eot of rigid sediment filter material On the northeast side Ot the pad area. The upg,adir,„t <br />diversion ditches will drain through rock Sediment bashes to the u„diatt„bed adjacent la„ds, aad pad cut/till areas <br />will be stabilized wvith temporary revegetat,o„ seeding. As a very limited disturbance area (approximately 1.0 acres <br />for the pad a„ d road. of which 2.4 acres is road) the disturbance areas meet the applicable mite,ia fo, a Small A,r,a <br />Exemption, the proposed drainage control meast,res should be etteetive i„ co„t,oll;ag runoff and Sedimentation, and <br />construction or 'Cull-3cale dfai„age and sedulle,lt control Structures is neither needed norjUStltlea. <br />Field geotechnical Investigations — TC occasionally eon dari:3 field geotechnical investigations prior to, and as the <br />basis fol -7 deai<sn au,d CouaTi LlMiO„ of engineered structures. Geotechnical investigations typically involve Shallow soil <br />bor;n,-s (up to '0 feet) using a hollow -stem auger, andior excavation of shallow (up to 15 feet) teat pits. For both soils <br />borings and test pits. Shrface diaturbanee ;a ,,,i„i,,,al („o more than 10 x 10 tees for boreholes, and 10 x 15 feet for <br />teat pita) md boil. d,Slurbance and subsequent Stabilization occur within a timeframe Of less than mirday for each <br />site (typically test pit excavation/soils boring, and backf Ili„g and leveli„g Of the resultant small area/auger-hole, <br />occurs i„ J C0116111.101.13 aeque„ce within the course of less than two hours for each location). The geotechnical <br />investigation activities do not involve the use Ot water and are normally conducted wide, d,y conditions o, when <br />the ground is trozen, So the potential for related hyd,olog;e ;,,,pacts ;s negligible. All geotechnical disturbance is <br />reseeded by broarlca3t need;„g W;TI,;„ 6-,nontlis Ot disturbance, although natural revegetation typically occurs much <br />aoo,ter due to the limited timeframe and extent Ot the associated distUrba„ee. Occaa;o„ally pmforated PVC p;pe <br />may be inserted in a completed borehole; and the ,r,,rta l,,de, of die hole backtilled with clean gravel, as a temporary <br />1�;e�on,et�r ii,atall:,tio„ to measure any fluctuation in water -levels. This type of piezometer installation ;a normally <br />very temporary (typically used less than a month) and will not ;,,,pact g,ou„dwater due to the Shallow depth and use <br />of natural C[,tt;„ga a3 barkfll. Ally p,ezOmeter Installations are reclaimed by either pulling the PVL pipe and <br />placing additional fill. or plugging the PVC pipe in-place t,Siu,g bagged be„ To„;r g,o,ut, die„ capping the <br />installation with a nllhlmUtrl 1.5400t surface plug of „antral clays or cement with a Site marker. <br />Lo:tdout Area Urainalze Modifications (MR14-254) - The drainage and aedunc„T controls for this area were <br />approved under an SAE. as referenced i„ the Per,,,,T tr_%i, however, given the contiguradon and type and level of <br />activities i„ d,ia ai'e.,. the e.:isting drainage and sediment controls were tound to be marginally adequate. The air <br />conditions were reviewed and evaluated, and the follow;ng changed, as dhow„ o„ F;gu,e EX49DD-F1_ were <br />implemented to ,,,od;ty and upgrade the s;te drainage controls in order to be effective under all reasonably <br />anticipated conditions. <br />The pad area on the north side of the rail spur was reduced in size by remov;„g the accumulation of eoally ,,,Ate,;Al, A„d <br />regrading and m3eed;„g p.n-t of this area. leaving only an access road along the north side of the spur. The drainage <br />configuration of the remaining pad Waa modified by f11;„r� u IoW a,ea and placing a berm to direct all drainage to the <br />collection sump. The Sump capacity and function were expanded by co„st,uct;„ g a aeeo„ d au,,,p i„ dr,,;ea, ,e,novi„g <br />acctn„ui.,ted sed;n,e„t rron, The CA;ati„g su,np, and rebuilding the rock perimeter filter. The control capacity of the raii <br />Spur collection ditch was increased by excavating aeve,al sed„nc„ t Taps ;n the ditch and adding additional rock check <br />da,,,s. As a very limited disturbance area (approximately 1.2 acres) the Loadout a,ea d;atu,ba„ce u,ecta the applicable c,;te,;a <br />for a Smell AiT., Exa„ption_ the proposed drainage control measures should be effective in Co,a,ofl;„g n,notf and <br />sedimentation. find co„atruCtio„ of fuii-acalc drmi,arc And sediment control structures is neither needed nor justified. <br />MR 16-295 2.05-84.10 04/01/16 <br />