Laserfiche WebLink
February 29, 2016 <br />Ms. Ginny Brannon <br />Director <br />Colorado Division of Reclamation_ Mining anti zaiery <br />1313 Sherman Street, Suite 215 <br />Den';er. Coiorado 80203 <br />RE: Temporary Cessation of Coal Production at the Bowie Resources. MC Bowie ffc Mine <br />Dear Ms. Brannon: <br />Bene E. Cicleooio <br />chief vper.arg officer <br />.,arrh '" mr«e, ick. mm <br />Gro..d,m miv. eolarad. ,nvo <br />Tcicphoec (970) 263.1-,e <br />g d i c l� e d le @ b o nisr cover c e s. ram <br />vvitR tnis letter, Bowie Resources, LLC advises the Colorado Division of Reclamation, Mining and Safety <br />that the bowie no. c Mine will temporarily cease pronuction or coal from its anderrround workinss <br />effective February 26, 2016. The mine will continue to be ventilated and maintained during this <br />tempora- cessation of coal production. The coal preparation plant will continue to operate as the mine <br />processes its current inventory or stocRpileti coal. All surrace operation, related to the maintenance of <br />the site, including the waste rock sites, will continue through the temporary cessation status wRicR we <br />anticipate at this time mirht continue for a year or more. The information required by rule 4.30.1(2) will <br />be provided to the DRI4I� witRin 90 [lays or Mis notice. <br />If you have questions re5ardin6 the cessation of mining at the Bowie #2 Mine, please contact Rick <br />Parkins or me at yi0 Z6s-D1s0. <br />Sincerely, <br />_ c <br />74r Gen . DiClaulsio <br />Chief Operating Officer <br />Bowie Resource Partners, LLC <br />Cc: Mike Boulay, DRMS <br />Daniel Hernandez, DRMS <br />Jason Musicx, DRIVIb <br />Jake Wilson, Bowie #2 <br />Bill Bear, Bowie #2 <br />Brian �ett)es, ORP <br />Rick Parkins, BRP <br />Chris Hansen, BRP <br />