My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-25_PERMIT FILE - C1982056A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2016-02-25_PERMIT FILE - C1982056A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:31 PM
Creation date
4/6/2016 1:53:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/25/2016
Section_Exhibit Name
Exhibit 14 Hydrologic Monitoring Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE A (continued) <br />MONITORING SITES & FREQUENCY <br />SURFACE FLOW MARCH -MAY <br />REGULAR SAMPLING <br />WATER <br />SITE WATER LEVEL & FIELD PARAMETERS QUALITY (see <br />note, below) <br />Foidel Creek <br />USGS 09243800 <br />8 <br />14 <br />USGS 09243900 <br />Site 900A <br />Fish Creek <br />16A <br />302 <br />27A <br />1003 <br />SW -13 <br />SW -14 <br />SW -15 <br />307 <br />305 <br />Trout qEeek <br />301 <br />69 <br />1005 <br />Middle Creek <br />29 <br />Schedule A <br />Schedule A <br />Schedule A <br />Schedule A <br />Schedule A <br />Schedule A <br />Schedule A <br />Schedule A <br />Quarterly - Flow only, fields semi-annually <br />Quarterly - Flow only, fields semi-annually <br />Quarterly - Flow only, fields semi-annually <br />Monthly - Flow only, fields semi-annually <br />Monthly - Flow only, fields semi-annually <br />Monthly <br />Monthly <br />Monthly <br />Schedule A <br />Schedule A <br />March -Monthly <br />April - Two times during month <br />May - Monthly <br />Once in March <br />Once In March <br />Once In March <br />Once In March <br />Once in March <br />Once in March <br />Once in March <br />Once in March <br />semi-annually <br />semi-annually <br />semi-annually <br />CONTINGENT SAMPLING <br />(sample only when pumping site 109 or <br />115 is discharging, between 24 hours <br />after the discharge begins and 36 <br />hours after it ends) <br />WATER LAB SULFATE <br />LEVEL & & LAB EC <br />FIELD EC <br />Weekly <br />Weekly <br />Once in March Weekly <br />Once In March Weekly <br />Once In March Weekly <br />Once In March Weekly <br />Note: If site is frozen, <br />March quality sample <br />may be taken in April <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />Monthly <br />PR1 )-11 Exhibit 14-7 11/19/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.