Maintenance, operation, and removal requirements for each of the sedimentation ponds and treatment facilities are
<br />similar, however, specific details relative to each are described separately in the following sections.
<br />Treatment Facility B receives runoff from the Tipple area, including the Belt -Out -Back (BOB) Stockpile.
<br />Upstream of the treatment facility is a clean-out sump, which captures wash -down flows and sediment from the
<br />Tipple. This sump is cleaned -out on an as -needed basis, based on visual observation of sediment accumulations.
<br />The treatment facility itself is comprised of an H shaped pond, which discharges to Foidel Creek. TC visually
<br />evaluates the extent of sediment accumulating as a delta in the inlet area in late summer or early fall, when water
<br />levels are at their lowest and the inlet area is exposed. If significant sediment has accumulated, to the extent that
<br />facility function or capacity would be reduced, sediment removal is scheduled and conducted using a long -reach
<br />backhoe, with the dredged material being loaded into trucks and transported to the refuse pile or pit for disposal.
<br />During CDPS field monitoring, the Facility B flume is visually inspected to determine that it is working correctly.
<br />Repairs, such as leveling, assuring free discharge, and removal of accumulated sediment in measuring devices is
<br />done on an as -needed basis. The facility will be removed when it is no longer needed. The H shaped pond will be
<br />backfilled with material from adjacent areas, graded to blend with the surrounding terrain, topsoiled, and
<br />revegetated.
<br />The Sedimentation Pond C structure controls runoff from the old Train Loadout area, which has been converted to
<br />the Truck Loadout. Historically, the pond has discharged infrequently, and holds only a very limited amount of
<br />water during spring runoff. TC will inspect Pond C for sediment accumulations in the same manner as described
<br />for Treatment Facility B. The same criteria will be used to determine if the pond requires cleaning. If so, the
<br />material will be removed and hauled to the refuse pile or pit for disposal. During the quarterly pond inspection, the
<br />outlet works of Pond C are inspected to determine if any maintenance work is required. Any required maintenance
<br />work is noted and completed within a reasonable time period following the inspection. When the pond is longer
<br />needed it will be removed. The outlet works will be removed, the embankment pushed in and graded to blend with
<br />the surrounding terrain, topsoiled, and revegetated.
<br />Sedimentation Pond D controls runoff from a portion of the surface facilities area, discharge from the Area 1 Pit,
<br />runoff from the Refuse Pile, and minor amounts of underground mine discharge (also from the Area 1 Pit). In
<br />general, because the Area 1 Pit is part of the mine -water collection and recycle system, discharge from the Area 1
<br />Pit or underground mine discharge occurs rarely, if ever, since process water demand equals or exceeds normal
<br />flows to the Area 1 Pit. With construction and initiation of operations for Washplant II, process water withdrawals
<br />from the Area l Pit for the Washplant have been balanced with inputs to meet process demands and maintain a
<br />stable water level in the Pit (well below the maximum design water level). The Washplant lI construction
<br />encroached on the Pond D emergency spillway, so the spillway was relocated to a location near the principal
<br />spillway riser on the Pond embankment. Spillway dimensions and configuration were preserved, and the new
<br />spillway location provides for better routing through the pond, increasing the distance between the eastern pond
<br />inlet and the spillway.
<br />TC will inspect Pond D for sediment accumulations in the same manner as described for Treatment Facility B. The
<br />same criteria will be used to determine if the pond requires cleaning. If so, the material will be removed and hauled
<br />to the refuse pile or pit for disposal. The pond is inspected during the regular CDPS sampling and the flume is
<br />checked to determine if it is functioning correctly. Any problems are noted and repairs made as -needed. Pond D is
<br />also an MSHA pond, subject to regular monthly inspections, except during the winter months. For the MSHA
<br />inspections, the outlet works and pond embankment are inspected, and any necessary repairs made in a timely
<br />basis. The pond will be removed when it is no longer needed. . The outlet works will be removed, the rock in the
<br />emergency spillway may be reclaimed or placed in the pond basin, the embankment will be pushed in and graded to
<br />blend with the surrounding terrain, and the area will be topsoiled and revegetated.
<br />Sedimentation Pond E controls runoff from a portion of the surface facilities, including the main coal stockpile
<br />area, prior to discharging to Foidel Creek. TC will inspect Pond E for sediment accumulations in the same manner
<br />as described for Treatment Facility B. The same criteria will be used to determine if the pond requires cleaning.
<br />RN 12-06 2.05-76.1 04/01/13
<br />
|