Laserfiche WebLink
INSPECTION REPORT - WEST PIT FILL <br />INDICATE QUARTER 1sT (92ND ❑ 3RD ❑ 4TH (j 2016 <br />YEAR <br />ALL QUARTERS NEED TO BE CERTIFIED �E <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No X Yes <br />If yes, explain: <br />Date of Survey: 3/28/16 by Mike Fraher <br />Reviewed By: Steve Weist <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 83.2 ft. <br />If yes, explain: <br />Date of Measurement: 3/28/16 <br />Measured By: Steve Weist, Kurt Blunt <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 3/28/16 <br />Inspected By: Steve Weist, Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 3/28/16 <br />Inspected By: Steve Weist, Kurt Blunt <br />Reference Permit - Volume 5-13, Exhibit 19, Page I a-4 <br />CF: HSEQ 24.20 Revised March 7, 2006 <br />