Laserfiche WebLink
EXHIBIT L <br />McCormick Excavation And Paving LLC (applicant) Stewart II <br />. The maximum number of acres to be disturbed would be 9 acres between both phases. Topsoil and <br />overburden run an average 18 inches which equals 21,780 cubic yards. To re -spread over permitted area <br />with haul distances of 1,200 feet or less, cost per cubic yard would be $1.35. Cost to re -spread <br />overburden and topsoil would be $29,403.00 To seed, fertilize and crimp would be $1,800 acre, this <br />total would be $16,200.00. To rip and disk access road and seed, fertilize and crimp and add topsoil to <br />road cost would be $600.00. To remove culvert from access road $300.00. The total cost with re- <br />spreading of topsoil and overburden and seeding would be $46,503.00 <br />