Laserfiche WebLink
Table 5 <br />Transit Mix of Pueblo, Inc. - East Pit <br />Projected Depletions, Credits, sad Releases (February 2016 - January 2018) <br />Scenario B - Net Excess Ditch Credit Availabk to Transit Mix <br />(a11 values in sere -feet) <br />Notes <br />(11 Net depletion from evaporation, mined material and dust control at Fast Pit, equal to Cd [121 in Table 4. <br />(2) Hasp -Ben Ditch credits availabk to Transit Mix and provided by P8W W. PBW W has the right to <br />store the Hamp-Bdl Ditch credits. therefore Transit Mix no longer has to replace the winter time return <br />flow obligation and is only entitled to die net excess crd'it after full augmentation of Chain of Lake <br />depletions (determined per Case No. 03CW8) and replacement of winter time delayed return flows. <br />[3J Required storage delivery under PBWW lease (120- ac -1t) equals 111- (21. Subject to transit tors. as <br />determined by the DW R. <br />[41 Backup water release rammed from Twin lanes Reservoir equals remaining replaccnwm requiremet s <br />that aro not met by the Hamp•Bell credits and the Pueblo lease. Transit losses are included and <br />estimated to be the sone as from Clear Creek Reservoir. No Twin Lakes Reservoir water is projected to <br />be required for this SWSP <br />lJ1M►._Baa <br />. ,..0 1a'Align' aauotit N saur. r.,n, rHc <br />w-rm.•ivmrhus rm <br />w <br />Net <br />Depletion <br />Replacement <br />by <br />Hawp-Bell <br />Ditch Credit <br />Replacement <br />by Delivery <br />Under <br />Pueblo Lease <br />Back Up Water <br />Release Required <br />From Twm Lakes <br />Reservoir <br />Month <br />111 <br />121 <br />131 <br />141 <br />Feb -16 <br />6.40 <br />6.40 <br />0.00 <br />0.00 <br />Mar -16 <br />8.07 <br />3.60 <br />4.47 <br />000 <br />Apr -16 <br />9.67 <br />0.00 <br />9.67 <br />0.00 <br />May -16 <br />12.47 <br />0.00 <br />12.47 <br />0.00 <br />Jun -16 <br />15.46 <br />0.00 <br />15.46 <br />0.00 <br />Jul -16 <br />15.28 <br />0.00 <br />15.28 <br />0.00 <br />Ang-16 <br />13.19 <br />0.00 <br />13.19 <br />0.00 <br />Sep -16 <br />11.48 <br />0.00 <br />11.48 <br />0.00 <br />Oct -16 <br />8.14 <br />0.00 <br />8.14 <br />0.00 <br />Nov -16 <br />6.63 <br />0.00 <br />6.63 <br />0.00 <br />Dec -16 <br />5.29 <br />0.00 <br />5.29 <br />0.00 <br />Jan -17 <br />5.34 <br />0.00 <br />5.34 <br />0.00 <br />Feb -17 <br />6.37 <br />6.37 <br />0.00 <br />0.00 <br />Mar -17 <br />8.07 <br />3.63 <br />4.44 <br />0.00 <br />Apr -17 <br />9.68 <br />0.00 <br />9.68 <br />0.00 <br />May -17 <br />12.47 <br />0.00 <br />12.47 <br />0.00 <br />Jun -17 <br />15.46 <br />0.00 <br />15.46 <br />0.00 <br />Jul -17 <br />15 28 <br />0.00 <br />15.28 <br />0.00 <br />Aug -17 <br />13.19 <br />0.00 <br />13.19 <br />0.00 <br />Sep -17 <br />11.48 <br />0.00 <br />11.48 <br />0.00 <br />Oct -17 <br />8.14 <br />0.00 <br />8.14 <br />0.00 <br />Nov -17 <br />6.63 <br />0.00 <br />6.63 <br />0.00 <br />Dec -17 <br />5.29 <br />0.00 <br />5.29 <br />0.00 <br />Jan -18 <br />5.34 <br />0.00 <br />5.34 <br />0.00 <br />2016-2017 Total <br />117.4 <br />10.0 <br />107.4 <br />0.0 <br />2017-2018 Total <br />117.4 <br />10.0 <br />107.4 <br />0.0 <br />Notes <br />(11 Net depletion from evaporation, mined material and dust control at Fast Pit, equal to Cd [121 in Table 4. <br />(2) Hasp -Ben Ditch credits availabk to Transit Mix and provided by P8W W. PBW W has the right to <br />store the Hamp-Bdl Ditch credits. therefore Transit Mix no longer has to replace the winter time return <br />flow obligation and is only entitled to die net excess crd'it after full augmentation of Chain of Lake <br />depletions (determined per Case No. 03CW8) and replacement of winter time delayed return flows. <br />[3J Required storage delivery under PBWW lease (120- ac -1t) equals 111- (21. Subject to transit tors. as <br />determined by the DW R. <br />[41 Backup water release rammed from Twin lanes Reservoir equals remaining replaccnwm requiremet s <br />that aro not met by the Hamp•Bell credits and the Pueblo lease. Transit losses are included and <br />estimated to be the sone as from Clear Creek Reservoir. No Twin Lakes Reservoir water is projected to <br />be required for this SWSP <br />lJ1M►._Baa <br />. ,..0 1a'Align' aauotit N saur. r.,n, rHc <br />w-rm.•ivmrhus rm <br />w <br />