My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-25_REPORT - M1993030
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1993030
>
2016-03-25_REPORT - M1993030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2020 10:59:10 PM
Creation date
3/30/2016 11:56:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993030
IBM Index Class Name
Report
Doc Date
3/25/2016
Doc Name
Annual Fee, Report & Map
From
Crystaljack Mine
To
DRMS
Annual Report Year
2016
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINED LAND RECLAMATION BOARD 110(1) ANNUAL REPORT <br /> For Season 2015 <br /> CRYSTALJACK MINING <br /> PERMIT NO. M-1993-030 <br /> Prepared: 18 March 2016 <br /> Summary: <br /> No mechanized equipment was operated on Crystaljack mining properties during 2015. Hand <br /> digging and prospecting and claim maintenance was carried out between 10 June and 15 July. <br /> Illegal digging is occurring on the Two Point claim and Qui-Buc No. 5 adjacent to roads. <br /> Map Depicting Operations: <br /> No changes have been made to permitted sites. Site 4 on the Ute claim is currently reclaimed and <br /> reseeded with good growth. <br /> Current Disturbances (2015): <br /> All dig sites on Crystaljack properties have been reclaimed except for access roads and proposed <br /> dig sites. All disturbances are 50%to 100%revegetated. <br /> Reclamation Summary (Includes 2015 Reclamation): <br /> Since this project began in 1993, approximately 4.89 acres have been excavated and reclaimed. <br /> All newly reclaimed sites have been reseeded the same season. These sites are then planted with <br /> trees the following season. Site 4 on the Ute has 50 percent growth. Sites 6 and Site 7 on the Two <br /> Point have 70 percent growth. All other sites exceed 80 percent or better. <br /> Reclamation Completed During2 015: <br /> Nothing additional was reclaimed in 2015. Site 4 on the Ute, 0.25 acre, has about 50 percent <br /> growth. <br /> Proposed 2016 Operations: <br /> Operations will be in conjunction with operations on Glacier Peak Mining claims between mid- <br /> May through early August. Mechanized operations will be limited to 10 working days on the <br /> Crystaljack claims. We will use a John Deere 350 or equivalent on the Two Point at 7 to <br /> complete this site for up to .5 acre. Site visits, including mineral extraction,reclamation, and <br /> claim maintenance will be continued throughout the season. <br />
The URL can be used to link to this page
Your browser does not support the video tag.