My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M2009010
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009010
>
_REVISION - M2009010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 2:09:05 PM
Creation date
3/30/2016 11:56:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009010
IBM Index Class Name
Revision
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> McCormick Excavation And Paving LLC (applicant) Stewart II <br /> . The maximum number of acres to be disturbed would be 9 acres between both phases.Topsoil and <br /> overburden run an average 18 inches which equals 21,780 cubic yards.To re-spread over permitted area <br /> with haul distances of 1,200 feet or less, cost per cubic yard would be $1.35. Cost to re-spread <br /> overburden and topsoil would be$29,403.00 To seed,fertilize and crimp would be$1,800 acre,this <br /> total would be$16,200.00.To rip and disk access road and seed,fertilize and crimp and add topsoil to <br /> road cost would be$600.00. To remove culvert from access road$300.00.The total cost with re- <br /> spreading of topsoil and overburden and seeding would be$46,503.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.