Laserfiche WebLink
of o COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> y� o MINERALS PROGRAM INSPECTION REPORT <br /> '# PHONE: (303) 866-3567 <br /> *1876 <br /> The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> Lyons Quarry M-1977-141 Quartz Boulder <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP.TIME: <br /> Monitoring Michael A. Cunningham March 2,2016 13:00 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> Aggregate Industries-WCR, Inc. Connie Davis 1 12c-Construction Regular Operation <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Normal I&E Program Partial Bond $191,600.00 <br /> DATE OF COMPLAINT: POST INSP.CONTACTS: JOINT INSP.AGENCY: <br /> NA None County <br /> WEATHER: IN T 'S S GNATURE: SIGNATURE DATE: <br /> Clear March 18,2016 <br /> The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br /> Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br /> Reclamation Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Hydrologic Balance <br /> PROBLEM/POSSIBLE VIOLATION: Problem: The Division has no evidence that the operator has a valid well <br /> permit, substitute water supply plan, or approved water augmentation plan for the exposed groundwater at the <br /> site. This is a problem related to 34-32.5-116(4)(h) of the Colorado Revised Statutes and 3.1.6(1)(a) of the <br /> Construction Materials Rules and Regulations governing injury to existing water rights. <br /> CORRECTIVE ACTIONS:The operator shall demonstrate that the operation is in compliance with the Office of <br /> the State Engineer, show evidence that the operator is taking measures to bring the site into compliance with <br /> the SEO, or backfill the pits to at least two feet above the groundwater surface by the corrective action date <br /> specified. Alternately, the operator may demonstrate the water within the pond is not groundwater. <br /> CORRECTIVE ACTION DUE DATE: 6/17/16 <br /> INSPECTION TOPIC: Reclamation Success <br /> PROBLEM/POSSIBLE VIOLATION: Problem: Failure to follow approved reclamation plan, or current reclamation <br /> plan needs to be updated and clarified pursuant to C.R.S. 34-32.5-116 (1). The operator must follow approved <br /> reclamation plan or provide sufficient information to describe or identify how the operator intends to conduct <br /> reclamation. <br /> CORRECTIVE ACTIONS:The operator shall submit a Technical Revision or Amendment, with the required <br /> revision fee, to update and clarify the current approved reclamation plan to reflect existing and proposed <br /> activities by the corrective action date. <br /> CORRECTIVE ACTION DUE DATE: 6/17/16 <br /> Page 1 of 7 <br />