Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Haul Backfill Mat. from Coal Handling <br />Site: Peabody Sage Creek Mine Permit Action: RN1-2015 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 3/30/2015 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Cat 770D <br />-Loader: CAT 988H <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Fac. to Portal <br />inti <br />Page 3 of 137 <br />Permit/Job#: C2009087 <br />Abbreviation: None <br />Filename: C087-001 <br />Shift basis: 1 per day <br />Cat D10T - lOSU <br />NA <br />NA <br />Water Tanker, 10,000 Gal. <br />Sunnort Eauinment <br />Maintenance Eauinment <br />Total work team cost/hour: $1,572.01 <br />MATERIAL OUANTITIES <br />Initial volume: 291,017 CCY Swell factor: 1.125 <br />Loose volume: 327,394 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pa.. l�weight) Basis: <br />Material weight: 2,650 Pounds/LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 82,000 Pounds <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />95 <br />100 <br />NA <br />NA <br />25 <br />Ownership cost/hour: <br />$60.18 <br />$85.43 <br />$133.56 <br />NA <br />NA <br />$53.31 <br />Operating cost/hour: <br />$82.57 <br />$104.48 <br />$173.02 <br />NA <br />NA <br />$27.41 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />$0.00 <br />Operator cost/hour: <br />$22.10 <br />$38.60 <br />$38.89 <br />NA <br />NA <br />$29.42 <br />Unit Subtotals: <br />$164.85 <br />$228.50 <br />$345.47 <br />NA <br />NA <br />$110.14 <br />Number of Units: <br />4 <br />2 <br />1 <br />0 <br />0 <br />1 <br />Group Subtotals: <br />Work: <br />$1,116.40 <br />Support: <br />$345.47 <br />Maint: <br />$110.14 <br />Total work team cost/hour: $1,572.01 <br />MATERIAL OUANTITIES <br />Initial volume: 291,017 CCY Swell factor: 1.125 <br />Loose volume: 327,394 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pa.. l�weight) Basis: <br />Material weight: 2,650 Pounds/LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 82,000 Pounds <br />CIRCES Cost Estimating Software <br />