My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-29_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2016-03-29_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:28 PM
Creation date
3/30/2016 8:52:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
3/29/2016
Doc Name
Cost Estimate
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
RN1
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 137 <br />COST SUMMARY WORK <br />Task description: Cost Summary <br />Site: Peabody Sage Creek Mine Permit Action: RN1-2015 Permit/Job#: C2009087 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 3/29/2016 County: Routt Filename: C087-000 <br />11:45:23 AM <br />User: JLE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet Task <br />Size Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />010 <br />011 <br />012 <br />013 <br />020 <br />021 <br />022 <br />023 <br />024 <br />030 <br />031 <br />032 <br />033 <br />034 <br />035 <br />040 <br />041 <br />042 <br />045 <br />046 <br />047 <br />050 <br />051 <br />052 <br />053 <br />054 <br />060 <br />Haul Backfill Mat. from Coal Handling Fac. to <br />Portal <br />TRUCKI <br />2 243.07 <br />3 102.12 <br />2 182.31 <br />1 63.46 <br />1 46.54 <br />1 6.94 <br />1 7.78 <br />1 1.94 <br />1 4.99 <br />1 11.51 <br />1 3.07 <br />1 0.58 <br />1 0.49 <br />1 3.24 <br />1 7.48 <br />1 1.99 <br />1 0.37 <br />1 0.32 <br />1 3.74 <br />1 8.85 <br />1 5.98 <br />1 2.61 <br />2 32.94 <br />2 22.27 <br />2 9.93 <br />1 10.36 <br />1 7.40 <br />1 1.03 <br />1 0.16 <br />1 0.08 <br />1 30.32 <br />$382,104.00 <br />$217,527.00 <br />$349,573.00 <br />$113,531.00 <br />$9,992.00 <br />$1,490.00 <br />$1,728.00 <br />$432.00 <br />$7,125.00 <br />$16,440.00 <br />$4,384.00 <br />$822.00 <br />$707.00 <br />$1,195.00 <br />$2,757.00 <br />$735.00 <br />$138.00 <br />$121.00 <br />$1,378.00 <br />$3,262.00 <br />$2,205.00 <br />$965.00 <br />$24,264.00 <br />$16,404.00 <br />$7,312.00 <br />$3,701.00 <br />$2,644.00 <br />$161.00 <br />$22.00 <br />$10.00 <br />$36,712.00 <br />Haul Backfill Material from Utility Pad Area to <br />Portal Face - <br />TRUCKI <br />Haul Backfill Material from South Facilities to <br />Portal Face - <br />TRUCKI <br />Remove Coal Stockpile Footprint <br />TRUCKI <br />Regrade Cut Material Over 6.93 ROM Coal Area <br />DOZER <br />Regrade Cut Material Over covered Storage Pad <br />Area <br />DOZER <br />Regrade Drill Pads COVl1, CCU31, CCU47, <br />CCU58, CCU67, CCU84, <br />DOZER <br />Regrade Drill Pads CCU087 and Septic Drainfield <br />DOZER <br />Remove Gravel from North Facilities Parking Area <br />TRUCKI <br />Remove Gravel from Main North Facilities Area <br />TRUCKI <br />Remove Gravel from North Facilities Electrical <br />Shop Area <br />TRUCKI <br />Remove Gravel from North Office Parking Area <br />TRUCKI <br />Remove Gravel from South Powder Magazine Pad <br />TRUCKI <br />Rip North Facilities Parking Area <br />RIPPER <br />Rip North Facilities Area <br />RIPPER <br />Rip North Electrical Shop Facilities Area <br />RIPPER <br />Rip North Office Parking Area <br />RIPPER <br />Rip South Powder Magazine Pad <br />RIPPER <br />Rip South Covered Storage Area <br />RIPPER <br />Rip Haulroad A/Al Reduction <br />RIPPER <br />Rip Haulroad B Reduction <br />RIPPER <br />Rip Haulroad D <br />RIPPER <br />Regrade Haulroad A/A1 Reduction <br />DOZER <br />Regrade Haulroad B Reduction <br />DOZER <br />Regrade Haulroad D <br />DOZER <br />Regrade Upper Sump <br />DOZER <br />Regrade Lower Sump <br />DOZER <br />Regrade Area Ditches <br />GRADER <br />Backfill and Regrade Microwave Tower Pad <br />(MR22) <br />DOZER <br />Replace Topsoil on Microwave Tower Pad <br />DOZER <br />Replace Topsoil on Coal Handling Facilities Area <br />SCRAPERI <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.