My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28_REPORT - M1980149
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980149
>
2016-03-28_REPORT - M1980149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2020 11:29:42 PM
Creation date
3/29/2016 9:41:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980149
IBM Index Class Name
Report
Doc Date
3/28/2016
Doc Name
Report Summarizing
From
Brierley Associates
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIERLEY DAILY FIELD REPORT , <br /> ASSOCIATES <br /> Cre<r,rg ipoce Uneeigmun0 <br /> Project Hokestra-North Slurry Wall Report No. 7 ' <br /> Location Firestone, CO Date Thursday, May 02, 2013 <br /> Client Hall-Irwin Page 3 of 4 <br /> Contractor Hall-Irwin File No. 112206-000 <br /> Weather Sunny Temperature Cold(32°-45°) , <br /> 1. Hall-Irwin(HI)on-site using a Komatsu PC 800 Excavator to remove alluvium material from the slurry <br /> trench. Fresh slurry was placed within trench as work progressed up-station to keep the walls of the <br /> trench from collapsing. Backfill material was mixed and placed throughout the day. ' <br /> 2. Both AM &PM profiles were observed and/or recorded. See attached AM/PM comparison chart for <br /> further details. ' <br /> 3. Performed quality control testing on fresh slurry, trench slurry, and soil-bentonite backfill. <br /> 4. Slurry level did not drop below 2ft of surface grade during excavation. t <br /> 5. In-trench slurry was out of specification for sand content during the AM testing. The de-sanding machine <br /> was in operation intermittently throughout the shift. A re-test in the PM was also above the specification <br /> limit for sand content and unit weight. Ruben with Hall-Irwin was immediately notified of the test results <br /> for the AM/PM testing. <br /> 6. The Komatsu DX65 dozer used in the backfilling operation was not working during this shift, and is <br /> currently under maintenance for an overheating problem. A rental dozer was utilized during this shift. <br /> The Komatsu PC300 excavator normally used in the backfill operation was being used to install pipe at a <br /> different location on-site during this shift. Hall-Irwin premixed backfill material the evening of 5-1-13 ' <br /> with the PC300. Then the rental dozer mixed it again on the morning of 5-2-13 before placement. The <br /> PC800 excavator was used later in the day to assist the rental dozer with mixing fresh backfill for the <br /> afternoon placement. <br /> 7. HI is keeping the toe of the backfill slope within 30±5 feet of the excavation to allow them to clean out , <br /> the key and help prevent sand settling in the slurry wall key. <br /> 8. Set Summaries: ' <br /> [10+60--).10+95] Start: 8:37 am(18ft)Finish:9:15 am(22ft) <br /> Top of Rock:gray/dark gray,soft,fresh,sandy CLAYSTONE. <br /> [10+95—>11+30] Start:9:29am(20ft)Finish: 10:00 am(24ft) <br /> Top of Rock:gray/dark gray,soft,fresh,sandy CLAYSTONE. , <br /> [11+30+11+65] Start: 10:24am(19ft)Finish: 10:52 pm(23ft) <br /> Top of Rock:gray/dark gray,soft,fresh,sandy CLAYSTONE. <br /> [11+6502+00] Start: 11:42am(19ft)Finish: 12:30 pm(23ft) ' <br /> Top of Rock:gray/dark gray,medium soft,fresh,blocky,slightly silty,sandy CLAYSTONE. <br /> [12+00--�12+35] Start:3:1Opm(18ft)Finish:4:00 pm(22ft) <br /> Top of Rock:gray/dark gray,soft,fresh,blocky,sandy CLAYSTONE. <br /> [12+35-->12+70] Start: 5:22pm(19ft)Finish:5:49 pm(23ft) ' <br /> Top of Rock:gray/dark gray,soft,fresh,blocky,sandy CLAYSTONE <br /> 9. PM profile was performed by Alonzo and Jesus(HI)after RY left the jobsite. <br />
The URL can be used to link to this page
Your browser does not support the video tag.