' Page 1 of 4
<br /> TABLE VI
<br /> TRENCH PROFILE AND SQUARE FOOTAGE EXCAVATED
<br /> HOKESTRA SOUTH SLURRY WALL
<br /> FIRESTONE,COLORADO
<br /> ' Cumlative Verified Depth Verified Depth
<br /> Distance from Distance from Measurement Measurement Daily Alluvium Daily Bedrock Total Excavated Total Daily Date
<br /> Station Start to Top of to Bottom of Excavated Excavated (to date) Excavated
<br /> 0+00 Bedrock Trench
<br /> ' feet feet feet (square feet (square feet (square feet
<br /> 0+25 25 25 21.0 25.0 525 100 625
<br /> 0+50 25 50 20.0 24.0 500 100 1,225
<br /> 0+75 25 75 19.0 23.0 475 100 1,800
<br /> 1+00 25 100 20.0 24.0 500 100 2,400
<br /> 1+25 25 125 19.0 23.0 475 100 2,975
<br /> 1+50 25 150 18.0 22.0 450 100 3,525
<br /> 1+75 25 175 19.0 23.0 475 100 4,100
<br /> 2+00 25 200 18.0 22.0 450 100 4,650
<br /> 2+25 25 225 18.0 22.0 450 100 5,200
<br /> 2+50 25 250 18.0 22.0 450 100 5,750
<br /> 2+75 25 275 18.0 22.0 450 100 6,300
<br /> 3+00 25 300 17.0 21.0 425 100 6,825
<br /> 3+25 25 325 19.0 23.0 475 100 7,400 7,400 5/20/2013
<br /> 3+50 25 350 18.0 22.0 450 100 7,950
<br /> 3+75 25 375 19.0 23.0 475 100 8,525
<br /> 4+00 25 400 18.0 22.0 450 100 9,075
<br /> 4+25 25 425 18.0 22.0 450 100 9,625
<br /> 4+50 25 450 18.0 22.0 450 100 10,175
<br /> ' 4+75 25 475 18.0 22.0 450 100 10,725
<br /> 5+00 25 500 17.00 21.0 425 100 11,250
<br /> 5+25 25 525 18.0 22.0 450 100 11800
<br /> 5+50 25 550 17.0 21.0 425 100 12,325
<br /> 5+75 25 575 17.0 21.0 425 100 12,850
<br /> 6+00 1 25 600 16.0 20.0 1 400 100 13,350
<br /> 6+25 25 625 16.0 20.0 400 100 13,850
<br /> 6+50 25 650 17.0 21.0 425 100 14,375
<br /> 6+75 25 675 16.00 20.0 400 100 14,875
<br /> 7+00 25 700 17.0 21.0 425 100 15,400
<br /> 7+25 25 725 17.0 21.0 425 100 15,925 8,525 5/21/2013
<br /> 7+50 25 750 17.0 21.0 425 100 16,450
<br /> 7+75 25 775 16.0 20.0 400 100 16,950
<br /> 8+00 25 800 16.0 20.0 400 100 17,450
<br /> 8+25 25 825 16.0 20.0 400 100 17,950
<br /> 8+50 25 850 15.0 19.0 375 100 18,425
<br /> 8+75 25 875 16.00 20.0 400 100 18,925
<br /> 9+00 25 900 17.0 21.0 425 100 19,450
<br /> 9+25 25 925 17.0 21.0 425 100 19,975
<br /> 9+50 25 950 17.0 21.0 425 100 20,500
<br /> 9+75 25 975 17.0 21.0 4251 100 21,025
<br /> 10+00 25 1000 18.0 22.0 450 100 21,575
<br /> 10+25 25 1025 17.0 21.0 425 100 22,100
<br /> 10+50 25 1050 17.0 21.0 425 100 22,625
<br /> 10+75 25 1075 17.0 21.0 425 100 23,150
<br /> 11+00 25 1100 18.0 22.0 450 100 23,700
<br /> 11+25 25 1125 18.0 22.0 450 100 24,250 8,325 5/22/2013
<br /> 11+50 25 1150 17.0 21.0 425 100 24,775
<br /> 11+75 25 1175 18.0 22.0 450 100 25,325
<br /> 12+00 25 1200 17.00 21.0 425 100 25,850
<br /> 12+25 25 1225 18.0 22.0 450 100 26,400
<br /> 12+50 25 1250 17.0 21.0 425 100 26,925
<br /> 12+75 25 1275 18.0 22.0 450 100 27,475
<br /> 13+00 25 1300 18.0 22.0 450 100 28,025
<br /> 13+25 25 1325 18.0 22.0 450 100 28,575
<br /> 13+50 25 1350 19.0 23.0 475 100 29,150
<br /> 13+75 25 1375 18.0 22.0 450 100 29,700
<br /> 14+00 25 1400 18.0 22.0 450 100 30,250
<br /> ' 14+20 20 1420 18.0 22.0 360 80 30,690 6,440 5/23/2013
<br /> 14+50 30 1450 17.0 21.0 510 120 31,320
<br /> 14+75 25 1475 16.0 20.0 400 100 31,820
<br /> 15+00 25 1.0 15.0 19.0 375 100 32,295
<br /> 15+25 25 1525 16.0 20.0 400 100 32,795
<br />
|