Laserfiche WebLink
Task description: <br />Site: Bowie No. 2 Mine <br />BULLDOZER WORK <br />Hubbard Creek Vent Shaft Pad <br />Permit Action: SLI <br />PROJECT IDENTIFICATION <br />Task #: 024 State: <br />Date: 3/8/2016 County: <br />User: JDM <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />Page 59 of 556 <br />Pere- tWob#: C1996083 <br />Abbreviation: None <br />Filename: C083-024 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - IOSU <br />Horsepower: 574 <br />Blade Type: Semi -Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $133.56 <br />NA <br />Operating Cost/Hour: $173.02 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.89 <br />NA <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $1,381.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,900 <br />Swell factor: 1.250 <br />Loose volume: 3,625 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />6,900 feet <br />2.900 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Source <br />AVG.) <br />CIRCES Cost Estimating Software <br />