My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2016-03-28_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:25 PM
Creation date
3/29/2016 7:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/28/2016
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 32 of 556 <br />BULLDOZER WORK <br />Task description: Regrade Train Loadout Facilities and Railbed Benches <br />Site: Bowie No. 2 Mine Permit Action: SLI Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 011 State: Colorado <br />Date: 3/2/2016 County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Abbreviation: None <br />Filename: C083-011 <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $1,381.88 <br />MATERIAL OUANTITIES <br />Initial Volume: 231,495 <br />Swell factor: 1.000 <br />Loose volume: 231,495 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Operator Estimate <br />Cat Handbook <br />200 feet <br />946.0 LCY/hr <br />Materials consistency description: Consolidated <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />5,900 feet <br />2.900 lbs/LCY <br />Weight description: Decomposed rock - 50% <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />1.0 <br />50% Earth <br />Source <br />AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$133.56 <br />NA <br />Operating Cost/Hour: <br />$173.02 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $1,381.88 <br />MATERIAL OUANTITIES <br />Initial Volume: 231,495 <br />Swell factor: 1.000 <br />Loose volume: 231,495 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Operator Estimate <br />Cat Handbook <br />200 feet <br />946.0 LCY/hr <br />Materials consistency description: Consolidated <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />5,900 feet <br />2.900 lbs/LCY <br />Weight description: Decomposed rock - 50% <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />1.0 <br />50% Earth <br />Source <br />AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.