Laserfiche WebLink
Page 28 of 556 <br />BULLDOZER WORK <br />Task description: Regrade New Truck Loadout and Coal Stockpile <br />Site: Bowie No. 2 Mine Permit Action: SLI Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 009 State: <br />Date: 3/2/2016 County: <br />User: JDM <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Abbreviation: None <br />Filename: C083-009 <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,000 feet <br />2.900 lbs/LCY <br />Weight description: Decomposed rock - 50% <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />50% Earth <br />Source <br />AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$133.56 <br />NA <br />Operating Cost/Hour: <br />$173.02 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $1,381.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 67,920 <br />Swell factor: 1.165 <br />Loose volume: 79,127 LCY <br />Source of estimated volume: <br />Operator Estimate <br />Source of estimated swell <br />Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,000 feet <br />2.900 lbs/LCY <br />Weight description: Decomposed rock - 50% <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />50% Earth <br />Source <br />AVG.) <br />CIRCES Cost Estimating Software <br />