My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2016-03-28_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:25 PM
Creation date
3/29/2016 7:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/28/2016
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bowie No. 2 Mine <br />HYDRAULIC EXCAVATOR WORK <br />Pull up Material for Utility Corridor <br />Permit Action: SLI <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 3/8/2016 County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 365C L 13'-7" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Page 16 of 556 <br />Permit/Job#: C1996083 <br />Abbreviation: None <br />Filename: C083-003 <br />Horsepower: <br />404 <br />Weight (MT): <br />70.51 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Load Bucket Capacity <br />Bucket Size Class: Small <br />Rated Capacity: 3.61 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90%) 0.850 <br />Adjusted Capacity: 3.07 LCY <br />Job Condition Correction Factors Site Altitude: 6900 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 323.00 <br />Adjusted Hourly Unit Production: 268.09 <br />Adjusted Hourly Fleet Production: 536.18 <br />JOB TIME AND COST <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: $94.13 <br />NA <br />Operating Cost/Hour: $141.12 <br />100 <br />Operator Cost/Hour: $35.36 <br />NA <br />Total Unit Cost/Hour: $270.61 <br />Total Fleet Cost/Hour: $541.21 <br />MATERIAL QUANTITIES <br />Initial volume: 11,490 CCY Swell factor: <br />1.165 <br />Loose volume: 13,386 LCY <br />Source of estimated volume: Page 3.02-2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty <br />Basic Job Condition Description: <br />SEVERE <br />Secondary Job Condition within Basic Description: <br />SEVERE <br />Cycle Time Value: <br />0.570 minutes <br />Load Bucket Capacity <br />Bucket Size Class: Small <br />Rated Capacity: 3.61 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90%) 0.850 <br />Adjusted Capacity: 3.07 LCY <br />Job Condition Correction Factors Site Altitude: 6900 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 323.00 <br />Adjusted Hourly Unit Production: 268.09 <br />Adjusted Hourly Fleet Production: 536.18 <br />JOB TIME AND COST <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.