Laserfiche WebLink
Task description: <br />Site: Bowie No. 2 Mine <br />HYDRAULIC EXCAVATOR WORK <br />Pull up Material for Utility Corridor <br />Permit Action: SLI <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 3/8/2016 County: Delta <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 365C L 13'-7" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Page 16 of 556 <br />Permit/Job#: C1996083 <br />Abbreviation: None <br />Filename: C083-003 <br />Horsepower: <br />404 <br />Weight (MT): <br />70.51 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Load Bucket Capacity <br />Bucket Size Class: Small <br />Rated Capacity: 3.61 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90%) 0.850 <br />Adjusted Capacity: 3.07 LCY <br />Job Condition Correction Factors Site Altitude: 6900 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 323.00 <br />Adjusted Hourly Unit Production: 268.09 <br />Adjusted Hourly Fleet Production: 536.18 <br />JOB TIME AND COST <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: $94.13 <br />NA <br />Operating Cost/Hour: $141.12 <br />100 <br />Operator Cost/Hour: $35.36 <br />NA <br />Total Unit Cost/Hour: $270.61 <br />Total Fleet Cost/Hour: $541.21 <br />MATERIAL QUANTITIES <br />Initial volume: 11,490 CCY Swell factor: <br />1.165 <br />Loose volume: 13,386 LCY <br />Source of estimated volume: Page 3.02-2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty <br />Basic Job Condition Description: <br />SEVERE <br />Secondary Job Condition within Basic Description: <br />SEVERE <br />Cycle Time Value: <br />0.570 minutes <br />Load Bucket Capacity <br />Bucket Size Class: Small <br />Rated Capacity: 3.61 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90%) 0.850 <br />Adjusted Capacity: 3.07 LCY <br />Job Condition Correction Factors Site Altitude: 6900 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 323.00 <br />Adjusted Hourly Unit Production: 268.09 <br />Adjusted Hourly Fleet Production: 536.18 <br />JOB TIME AND COST <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />