My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2016-03-28_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:25 PM
Creation date
3/29/2016 7:29:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/28/2016
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 of 556 <br />1.31i1iii010YA!if,101RS <br />Task description: Regrade D -Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: SLI Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 3/2/2016 <br />User: JDM <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C083-002 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - 10SU <br />Horsepower: 574 <br />Blade Type: Semi -Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $133.56 <br />NA <br />Operating Cost/Hour: $173.02 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.89 <br />NA <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $1,381.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 260,593 <br />Swell factor: 1.165 <br />Loose volume: 303,591 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Operator Estimate <br />Cat Handbook <br />100 feet <br />1,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />6,900 feet <br />lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.