Laserfiche WebLink
Page 9 of 556 <br />151 <br />152 <br />154 <br />155 <br />156 <br />157 <br />165 <br />170 <br />171 <br />172 <br />173 <br />174 <br />180 <br />181 <br />182 <br />183 <br />241 <br />242 <br />261 <br />301 <br />302 <br />352 <br />353 <br />369 <br />374 <br />379 <br />380 <br />381 <br />45A <br />45B <br />45C <br />45D <br />45E <br />Drill Seed Drill Pads <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />334.64 <br />$103,141.00 <br />$78,274.00 <br />$132,082.00 <br />$1,479.00 <br />$247.00 <br />$52,559.00 <br />$1,775,800.01 <br />$675.00 <br />$128,708.80 <br />$138,759.00 <br />$238,012.40 <br />$103,205.76 <br />$46,787.00 <br />$46,787.00 <br />$4,574.00 <br />$29,916.00 <br />$7,414.00 <br />$5,598.00 <br />$89,262.41 <br />$496.00 <br />$1,011.00 <br />$2,644.00 <br />$2,542.00 <br />$4,166.71 <br />$4,903.38 <br />$3,211.00 <br />$1,362.00 <br />$1,550.00 <br />$129,643.00 <br />$8,439.00 <br />$38,605.00 <br />$7,008.00 <br />$40,457.00 <br />Drill Seed Lt -Use Roads to Drill Pads and Terror <br />Creek <br />REVEGE <br />249.96 <br />Broadcast Seed Mix 3 on Gob Pile #3 <br />REVEGE <br />0.00 <br />Drill seed Hubbard Creek Vent Shaft Pad <br />REVEGE <br />0.00 <br />Drill Seed Rock Laydown Area <br />REVEGE <br />0.00 <br />Weed Control Over 10 -Year Liability Period <br />REVEGE <br />0.00 <br />Demolish and Remove all Structures <br />DEMOLISH <br />160.00 <br />Proctor Testing of Backfill (5 tests) <br />SITEMAINT <br />ENANCE <br />0.00 <br />Nuclear Density Testing of Backfill <br />SITEMAINT <br />ENANCE <br />0.00 <br />Water Truck for Moisture Augmentation of <br />Backfill Material <br />MISCTRUK <br />1,437.02 <br />Site Maintenance - Ten Years <br />SITEMAINT <br />ENANCE <br />292.00 <br />Support Equipment for Scraper Hauling <br />SITEMAINT <br />ENANCE <br />449.16 <br />Mobilize/Demobilize Equipment for First <br />Construction Season <br />MOBILIZE <br />12.00 <br />Mobilize/Demobilize Equipment for Second <br />Construction Season <br />MOBILIZE <br />12.00 <br />Mobilize/Demoblize Equipment for Pond Removal <br />MOBILIZE <br />6.50 <br />Mobilize/Demobilize Equipment for Yearly Site <br />Maintenance <br />MOBILIZE <br />14.00 <br />Regrade Terror Creek Light -Use Road <br />DOZER <br />29.73 <br />Replace Topsoil from Stockpile to Terror Creek <br />Lt -Use Road <br />DOZER <br />22.45 <br />Concrete Plug and Backfill Vent Shaft <br />MINESEAL <br />40.00 <br />Reseed Add'I Disturbance from Utility Boreholes <br />at Fan Bench <br />REVEGE <br />1.00 <br />Regrade Fan Bench - Utility Borehole Mudpit <br />Add'1 Dist. <br />DOZER <br />4.06 <br />Re -topsoil Pitkin Mesa Pipeline corridor <br />DOZER <br />10.60 <br />Reseed Pitkin Mesa Pipeline Corridor <br />REVEGE <br />15.00 <br />Seal Well DH-67blw <br />BOREHOLE <br />0.00 <br />Seal CWI-DH-58A <br />BOREHOLE <br />0.00 <br />Regrade Section 5 Road <br />DOZER <br />12.88 <br />Re -topsoil Section 5 Road <br />DOZER <br />5.46 <br />Reseed Section 5 road <br />REVEGE <br />16.00 <br />Distribute Gob Pile #2 cover hauled by T/L <br />DOZER <br />375.26 <br />Haul Cover Material from Borrow Area #1 to Gob <br />Pile #2 <br />TRUCKI <br />50.03 <br />Haul Cover Material from Borrow Area #2 to Gob <br />Pile #2 <br />TRUCKI <br />228.88 <br />Haul Cover Material from Borrow Area #3 to Gob <br />Pile #2 <br />TRUCK1 <br />41.55 <br />Haul Cover Material from B Portal Storage to Gob <br />Pile #2 <br />TRUCKI <br />108.83 <br />SUBTOTALS: <br />13761.57 <br />$9,463,472 <br />INDIRECT COSTS <br />CIRCES Cost Estimating Software <br />