My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-25_REPORT - M1977219
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977219
>
2016-03-25_REPORT - M1977219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:22 PM
Creation date
3/28/2016 10:03:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977219
IBM Index Class Name
Report
Doc Date
3/25/2016
Doc Name
Annual Fee, Report and Map
From
Summit Brick & Tile Co.
To
DRMS
Annual Report Year
2016
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e , <br /> Page 4 of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres. Total acres Total acres Total acres <br /> backfilled: 6-,5 seeded w/ i, S w/topsoil 1,j mulched w/ 14)/4 <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil �� Mulch application <br /> graded: I,s fertilized w/ N )4. replacement 6 rate(tons/ac): NA <br /> apvd fertilizer: depth(in.): <br /> Seed b to AD C.,s-r Fertilizer Mulch <br /> application application N 1frt application p.) Jr <br /> method: �(2E�9A method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? Gl. NO N/A <br /> If"YES", indicate the weed species,control area,control type,application rate and treatment date on the report map. <br /> S-P oT SP R A'f we, 0 714 lane si►.a orttttr. UE S 145 NSD RT 51 L o2/r cPF M/4.EZTbNE <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? Oar NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? p NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO TA_) <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES `D N/A <br /> Nitas 4P l 1047+sMM t' FPCt T=UEtWit NO% <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? 4 NO N/A <br /> 19. Is your basis for legal right to enter still valid? Mb NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.