Laserfiche WebLink
Parc 4 of � <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />0 <br />seeded w/ <br />C <br />w/topsail <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />CJ <br />fertilized w/ <br />replacement <br />N ] } <br />rate (tens/ac): <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />ulch <br />application <br />N R <br />application <br />!application <br />method: <br />method: <br />ethod: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? NO N/A <br />It "YES", indicate the weed species; control area, control type, application rate and treatment nate on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? 1'E Nu N/A <br />If "NO�-, please explain: <br />15. Is the reserved topsoil vegetated stabilized in accordance with Rule 3.1.9(1)? Y5 Nu N/A <br />If "NO" please e,.pla„.: <br />16. If mining has exposed groundwater; is the site in compliance with the approved mining plan and office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO /A <br />17. Aye all haaaLdnus u,airtia15 5tu,ed within appiuuved Spill wutauuueut atiuetuiuu5? YES NO /A <br />► 8. is you, f..ancial warranty value sufficient to cover the cost to complete reclamation-! SYES Nu N/A <br />19. Is your basis for legal right to enter still valid? NO <br />20. Does your permit require you to submit monitoring information annually? YES No N/Ai, <br />If "Yes', please attach the required monitoring results to this Annual Report. <br />21. As required by Uolorado Mined Land Reclamation Act and/or c;olorado Land Reclamation Act for the Extraction of <br />Construction materials (C.R.S. 34-3,z-116 or 34-32.5-116); attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: § , v <br />