Pane 4 of 5
<br />12. Total acres m various stages of reclamation, since permitted mining activities began:
<br />Total acres
<br />nacKfilled:
<br />j
<br />�J
<br />Total acres
<br />Seeded ,,/
<br />approved mix:
<br />Total acres
<br />whopsoil
<br />�e laced:
<br />0
<br />V
<br />Total acres
<br />mulched w/
<br />appLovcd,i,uleh:
<br />Total ae,e5
<br />(�
<br />Total acresTopsoil
<br />te,tiliLcd w/
<br />,eylaee,uc„t
<br />Mulch application
<br />.ate (toes/ac):
<br />U
<br />graded:
<br />V
<br />apvd fertilizer:
<br />�/
<br />depth (in.):
<br />Seed
<br />t'ertiliaei
<br />Mulch
<br />application
<br />application
<br />Q �
<br />application
<br />,,,ethod:
<br />N
<br />,,,ethod:
<br />method:
<br />13. IS seed control being conducted in accordance With an approved Weed Control PlantY S NU N A
<br />If -y tS", indicate the weed 5pccic3_ co„nol men, control type, application rate and treatment date on the report map.
<br />14. I5 adequate topsoil reserved for reclamation, based on your approved pen -nit? OESNO N A
<br />If -ND--, plcaze exvlain:
<br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1) r ots NDN
<br />1f "NO" t,lca5c
<br />16. If mining has exposed groundwater, is the site in compliance With the approved mining plan n ffice of the State
<br />tllgi„ee, (Well Pe,,,,it; S.W.S.P., .,,,d/o, Pe„nanent Augmentation Plan)? CEY NO N/A
<br />17. Are all hazardous materials stored within approved spill containment structures! YES NO D/A
<br />18. Is your financial warranty value sutt,dc„t to %,oVe, the cunt to eo,ul,lete ,ecla,,,atio„? YES NO N/A
<br />IV. 15 you, ba5i5 fo, legal , ibht to e„ tc, still valid? YES NO
<br />20. Does your pennit require you to submit monitoring information annually? YE NO N A
<br />if Y e5 yleabe attach the ,cLjuu cd ,,,o„ito, i„g results to this Annual Report.
<br />21. As required by Colorado Mined Land Reclamation Act and or Colorado Land Reclamation Act for the Extraction of
<br />Co„5t,uctio„ Mateual5 (C.R.S. 34-32-116 u, 34-32.5-116), attach a map to this report that accurately depicts the permit
<br />boundary, current affected area boundary a„a location of the ao,ease5 5t,ecifed in iteu,5 7- 12 a„d 14. UPDATED
<br />MAY A 1 1 ACHED:
<br />
|