My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-18_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2016-03-18_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:31 PM
Creation date
3/23/2016 8:46:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
REVISION
Doc Date
3/18/2016
Doc Name
Engineering Certification AM02
From
Brannan Sand and Gravel Co. / Ready Mix
To
DRMS
Type & Sequence
AM2
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applegate <br />Group, enc. <br />Water Resource Advisors for the West <br />DAILY CONSTRUCTION REPORT <br />Date: 12/7/2015 Job Name: Brannan Pit 29 — TR 2.2 Report No. 1 <br />AG Project #: 10-116 Client: Brannan Sand and Gravel <br />Daily Overview: Drain line installation Time on Site: 11:30 am <br />Weather: 56° F, mostly cloudy, no precipitation <br />Principals on Site: Tom — Brannan; Tom and Carrie — Applegate <br />Equipment Data: front end loader <br />2 excavators 2- wellpoint piston pumps <br />Work Performed Today: <br />Contractor is installing ADS N-12 slotted pipe along southern boundary of property. <br />Excavator trenching and placing granular material, laborers placing pipe, excavator placing <br />additional material, laborers placing geofabric wrap around filter material, additional granular fill <br />placed on top of granular fill, backfill with native soils over the granular material. 1/3 to 1/2 of <br />the pipe has been placed along south boundary. <br />Manholes and solid wall pipes are onsite and stockpiled. Solid wall pipe has been installed for <br />about 1/4 of the western boundary along with one manhole base. <br />Contractor has installed a wellpoint piston pump system to control groundwater during <br />construction. The pump manifold extends along the entire southern boundary of the drain limits. <br />The contractor indicated that the well points are approximately 17 -ft below grade to control <br />groundwater during drain line installation. The pumps discharge into the dewatering ditch for the <br />gravel pit. The standing water in the adjoining parcel has been significantly drawn down by the <br />dewatering system. <br />1490 West 121st Avenue, Suite 100 <br />Denver, Colorado 80234 <br />1 <br />(303) 452-6611 • Fax: (303) 452-2759 <br />www.applegategroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.