My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-22_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2016-03-22_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2020 11:13:53 PM
Creation date
3/22/2016 12:21:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
3/22/2016
Doc Name
Inspection Report (Revised)
From
DRMS
To
Mountain Coal Company, LLC
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 16, 2016 C-1980-007/West Elk Mine LDS <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization; Placement: <br /> The prep plant was not running at the time of the inspection, so no refuse was being generated. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance 4.03.1(5)and <br /> (6)/4.03.2(5) and(6);Reclamation 4.03.1(7)/4.03.2(7): <br /> The roads around the site were in good shape,but muddy in some areas from melting snow. <br /> SLIDES and DAMAGE -Rule 4.12: <br /> A slump on the north facing out-slope of the Material Storage Bench(MSB)was reported by MCC on <br /> February 22,2016. The site was inspected and appeared to be stable,but had not yet been repaired. It appeared <br /> that the slump was related to water leaking from a joint in culvert C5E-25 (formerly C2-3A). The culvert had been <br /> temporarily replaced with a shorter culvert running directly down the fall line of the slope. It was agreed that if <br /> this is to become a permanent solution a revision will be needed,with revised designs for the downstream <br /> structures. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.