Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />amec <br />foster <br />wheeler <br />Underground Workings: <br />Blasting: <br />UG #6692: Previously drilled boreholes were shot. A Cat excavator removed shot rock. <br />Further remediation required. <br />Confirmatory Drilling: <br />None. <br />Remediation: <br />UG #6477: A Cat excavator removed shot rock. Further remediation required. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />A Cat excavator prepared leak detection trench in the vicinity of station 130+00. A Cat skidsteer <br />assisted with construction of approximately 200 LF of leak detection per project plans and <br />specifications. <br />Geomembrane: <br />None. <br />Miscellaneous: <br />None. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />