My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-16_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-03-16_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:13 PM
Creation date
3/16/2016 12:39:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
3/16/2016
Doc Name
Adequacy Review Responses
From
Tri-State Generation & Transmission Assoc.
To
DRMS
Type & Sequence
MR97
Email Name
TNL
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111 <br />March 16, 2016 <br />Mr. Brock Bowles <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: New Horizon Mine <br />Permit No. C-1981-008 <br />MR -97 Adequacy Review Response <br />Dear Mr. Bowles: <br />Tri-State Generation and Transmission Association (Tri-State) has received your adequacy review <br />letter for MR -97, dated March 15, 2016 and provides the following responses to your comments on <br />behalf of the Western Fuels -Colorado, A Limited Liability Company (Western Fuels -Colorado) <br />New Horizon Mine. <br />4.05.13(l) — Groundwater Monitoring <br />A written interpretation of monitoring data, identifying trends and including descriptions of <br />groundwater level and annual potentiometric surface maps was request to be included in the <br />annual hydrology reports. The operator provided a response that a written interpretation of <br />the data will be provided in the annual hydrology report, but there is no reference to when <br />this will occur. The recently submitted 2015 annual hydrology report did not include an <br />interpretation of the data provided. Please define that this additional interpretation of data <br />will occur from 2016 forward. <br />Response: The Division needs to note that the 2015 Annual Hydrology Report (AHR) was <br />submitted in nearly the same time frame that the midterm review was issued by the Division. <br />The Division required the midterm review to be addressed by February 26, 2016. MR -97 <br />was submitted to address the midterm adequacy on February 22, 2016. The AHR is due at <br />the end of calendar year. Thus MR -97 was not approved prior to submittal of the 2015AHR, <br />and the commitment to provide the data was not approved prior to submittal of the 2015 <br />AHR. That being said, as also stated in Tri -State's February 22, 2016 submittal letter of <br />MR -97, in accordance with Rule 4.05.13(4)(c)(iii), a written interpretation of the monitoring <br />data will be provided in the annual hydrology report from 2016 forward. <br />AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy Cooperative t:1 <br />CRAIG STATION ESCALANTE STATION NUCLA STATION <br />P.O. BOX 1307 P.O. BOX 577 P.O. BOX 698 <br />CRAIG, CO 81626-1307 PREWITT, NM 87045 NUCLA, CO 81424-0698 <br />970-824-4411 505-972-5200 970-864-7316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.