Laserfiche WebLink
I <br />EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? <br />Yes No X <br />2). Is erosion occurring at any section of the emergency spillway? <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No X <br />Yes No X <br />Elevation of Water Surface: Dry <br />Elevation to top of Sediment: 6234.3 based on design elevation of 6240.2 at lip of riser <br />OTHER OBSERVATIONS <br />Current operations and maintenance appear to be satisfactory. No problems or concerns <br />were observed. <br />MSHA Qualified Impoundment Inspector <br />Date <br />Robert E. Leverington, Jr. <br />Professional Engineer Directing Inspection <br />March 4, 2016 <br />Date <br />