Laserfiche WebLink
2015 Annual Reclamation Report Energy Fuels Coal, Inc - Southfield Mine <br />Conclusion <br />EFCI has reclaimed the vast majority of the disturbed areas at the Mine Site and Loadout Area. <br />The completed work has resulted in reclamation of disturbed areas to provide for long-term <br />stability, effective drainage control, and vegetative establishment in accordance with the <br />approved reclamation plan and consistent with the proposed postmining uses. Phase II and <br />Phase III bond release was requested in 2015 for 101.7 of the 106.3 disturbed acres, with <br />documentation that all standards for revegetation were met or exceeded. <br />Page 9 <br />