My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-24_PERMIT FILE - C2010089A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2016-02-24_PERMIT FILE - C2010089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2018 9:01:57 AM
Creation date
3/14/2016 8:25:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
2/24/2016
Doc Name
Operation Plan
Section_Exhibit Name
Section 2.05.3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
maximum that will be employed. The exposed coal portion of the bottom of the pit is generally <br />120 feet wide. Since this operation uses the graded spoil as a base for the overburden truck <br />traffic, no ungraded spoils will remain behind the pit or the trucks could not reach the edge of the <br />pit. The overburden spoil is placed at angle of repose in the backfill, at an approximate angle of <br />35.2 degrees. The cut slopes for the overburden removal range from 0.3H:1 V in the upper <br />portion to near vertical in the competent lower portions. <br />Mining will generally progress south to north with the long axis of the pits generally east to west. <br />The overburden will be placed or pushed into an adjacent or nearby mined out pit panel except <br />for the initial cut where topsoil and overburden will be placed adjacent to the pit onto land <br />designated as Topsoil Stockpile and Overburden Stockpile. These stockpiles are shown in the <br />southern portion of the permit area. This topsoil and overburden will be used to reclaim the last <br />cut but would also be used to reclaim any cut if the mine were to cease operation before the last <br />cut is reached (See Map 2.05.2-1). <br />During overburden removal operations, some selective handling of material will be performed <br />based on chemical and physical core data contained in Section 2.04.6, Geology Description, and <br />discussions presented in Section 2.05.4(2)(d), Topsoil Redistribution. <br />After the upper coal seam is removed, the parting material composed of alternating layers of <br />sandstone, shale or clay will be removed. Partings and interburden material may range in <br />thickness from a few tenths of a foot to approximately 12 feet. The thinner partings will be <br />removed by loader or dozer and hauled or pushed into an adjacent mined out pit. The thicker <br />partings and interburden will be dozed into a mined out pit or excavated by the shovel and trucks <br />and hauled to a mined out pit. <br />After the overburden or parting has been removed above each individual coal seam, a dozer, <br />loader or motor grader will clean off any overburden or parting material remaining on top of the <br />coal. In order to facilitate handling of the coal, a dozer will rip or break up the coal. Contracted <br />haulage trucks of approximately 25 ton capacity will be loaded by a loader. Once a truck is <br />loaded, the coal will be transported approximately eight miles to the power station. Table 2.05.3- <br />1 lists the major mining equipment to be used at the NHN Mine. <br />A coal stockpile will be established out of, but adjacent to the pit. The stockpile will be located <br />in an area with controlled drainage to a permitted discharge outfall. The stockpile location may <br />change with pit advancement to ensure the stockpile location is close the active mining area. <br />The estimated coal tonnage, overburden and parting volumes to be extracted for all mining areas <br />are presented on Table 2.05.3-2. <br />Section 2.05.3 Page 2 February 2016 (MR -16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.